- Your Buyer Wants to Assign the Purchase Agreement to Someone Else. Can an Ontario Resale Seller Say No?
On a resale deal in Ontario, a seller usually has no automatic veto over a buyer's assignment of the agreement. What matters is the line between assignment and novation: an assignment leaves the original buyer liable; a novation lets them walk away.
- Your Builder Delayed Again: How Tarion Delayed Closing Compensation Actually Works
When an Ontario builder delays your new home, Tarion compensation turns on three things: whether your date is a closing or occupancy date, the critical dates statement, and claiming on time. The daily amount, the total cap, and the deadlines.
- You Paid Six Figures in Pre-Construction Deposits. How Much Is Actually Protected?
Ontario pre-construction deposits are paid in stages, and Tarion deposit protection has hard caps: $20,000 for condos, up to $100,000 for freehold. Where the money is held, what ECDI covers, and what to confirm before you sign.
- You Have the Keys to Your Pre-Construction Condo — So Why Aren't You the Owner Yet? Interim Occupancy and Final Closing in Ontario
Ontario pre-construction condos close in two steps: interim occupancy first, final closing after registration. The three statutory parts of the occupancy fee, why there is no title and no mortgage during occupancy, and what else falls due on final closing day.
- Why Does a Pre-Construction Condo Close Twice? Interim Occupancy, the Occupancy Fee and Final Closing
A pre-construction condo in Ontario closes in two stages: interim occupancy first, where you pay a monthly occupancy fee that is not a mortgage, then final closing after registration. Plus the PDI, the Tarion 1-2-7 warranty and closing adjustments.
- What Tarion's 1, 2 and 7-Year Warranties Actually Cover in Ontario — and What They Don't
Ontario's new home warranty runs in 1, 2 and 7-year tiers that cover completely different things, with dollar caps. What each tier covers, deposit and delay protection before you move in, the exclusions, and Tarion vs. the HCRA.
- What Do Tarion's One-Year, Two-Year and Seven-Year Warranties Actually Cover?
Ontario's Tarion warranty runs in three windows from possession: year 1 for workmanship and Code compliance, year 2 for water penetration and building systems, years 3-7 for major structural defects, with total caps of $400,000 freehold and $300,000 per condo unit for agreements signed on or after July 1, 2023.
- Thinking of Assigning Your Pre-Construction Condo? Clear These Four Hurdles First
An Ontario condo assignment is not a normal sale. Builder consent and fees, GST/HST on assignments since May 2022, the 365-day flipping rule taxing profit as business income, and a thin buyer pool. Run the after-tax numbers first.
- The Plan Said 650 Square Feet — So Why Does It Feel Smaller? How Ontario Measures Floor Area
Ontario's HCRA floor-area directive measures stated area to the outside face of exterior walls and the centre line of party walls, generally excludes balconies, and allows a ±2.0% tolerance. Stated vs usable area, why floors differ, and what you can do beyond the tolerance.
- The Occupancy Fee Is Neither Mortgage nor Rent: Where Your Money Goes During Interim Occupancy of an Ontario Condo
Ontario's interim occupancy fee is capped by statute at three components — interest on the unpaid balance, estimated taxes and projected common expenses. Why none of it pays down principal, how long the period can run, and how to budget it before you sign.
- Tarion in Ontario: What a New-Home Buyer Actually Gets — the 1-, 2- and 7-Year Warranty in Plain Terms
Ontario's statutory new-home warranty is provided by your builder and backed by Tarion: one, two and seven years of coverage after possession, plus deposit protection and delay compensation before it. What each tier covers, the dollar caps, and the filing windows you cannot miss.
- Signed a Pre-Construction Deal You No Longer Want? In Ontario, Your Options Depend Entirely on Timing
Wanting out of an Ontario pre-construction purchase: the 10-day rescission window, builder-side exits in the Tarion Addendum, assignment, and what default really costs.
- Should You Buy Pre-Construction Now? A Decision Checklist, Not a Market Call
Before asking whether now is the right time to buy pre-construction, pass four tests: can your money stay committed long enough, does the builder's record hold up, is the project really advancing, and what is your exit if plans change.
- Selling a Home You Built Yourself in Ontario: Do You Need an HCRA Licence, and Where Did the Tarion Warranty Go?
Selling an owner-built home in Ontario: licensing sits with the HCRA, warranty with Tarion. Lived-in-then-sold is one thing; built-and-sold-never-occupied is another. An owner-built home has no statutory warranty and cannot be enrolled later.
- Selling Your Pre-Construction Condo Before Closing? In Ontario, Two Gates Decide It: The Builder and The Tax Rules
An Ontario pre-construction assignment sells the purchase contract, not the home. It turns on the agreement's assignment clause and the builder's written consent; since May 7, 2022 assignments are taxable for GST/HST, the deposit portion is excluded only if the agreement says so in writing, and a holding period under 365 days can trigger the anti-flipping rule.
- Pre-Construction Incentives Keep Getting Bigger. Here Is How to Work Out What They Are Actually Worth
Do not add up pre-construction incentives the way the sales brochure does. Sort them into real savings, timing shifts and sticker-price games, revalue each one, and remember what the law actually protects.
- Pre-Construction Closing in Three Stages: Occupancy, the PDI, and Title — What to Get Right at Each Step
Ontario pre-construction closing runs in three stages: interim occupancy with its fee, the PDI where defects must land on the form, and final closing after registration. What to check at the PDI, why common elements run on a separate warranty clock, and why levy caps are negotiated at signing.
- Pre-Construction Closing Day Is Coming: Close on the Unit or Assign It? Run These Three Sets of Numbers First
Close or assign a pre-construction unit in Ontario? First check whether your APS allows assignment, then the HST on the assignment under CRA's post-2022 rules, then the mortgage and the 2026 enhanced new-home HST rebate window on the closing side.
- Pre-Construction Closing Costs in Ontario: What Is in the Contract, and What Does Not Exist Yet at Signing
The largest pre-construction closing cost is often not fixed at signing: development charges and levies are collected at the rates in effect at closing, unless you negotiated a cap. Every line on the closing statement, sorted by source.
- Pre-Construction Assignment Sales in Ontario: Your Rights Are in the Original Contract
An Ontario pre-construction assignment sells your place in the builder contract, not the home itself: builder consent, GST/HST since May 7, 2022, the flipping rule, and land transfer tax explained from primary sources.
- Moved In but Don't Own It Yet: How Ontario's Interim Occupancy Fee (Phantom Rent) Is Calculated
Between moving into a pre-construction condo and the building's registration, Ontario buyers pay a monthly occupancy fee. The three-part formula under s.80 of the Condominium Act, why none of it pays down your price, and why the length of the period is not yours to control.
- Judging a Builder in Ontario: Check the Record, Not the Brand
There is no single best builder for every project. Check the licence and discipline record in the HCRA Ontario Builder Directory, the warranty history with Tarion, then examine the specific project: contract, progress and standard finishes.
- Is Pre-Construction Really Cheaper Than Resale? Add Up the Full Cost First
Comparing pre-construction and resale by sticker price misleads. Add the pre-con charges — levies, net HST, occupancy fees, upgrades — and the resale side's taxes and condition costs, then compare the day-you-move-in totals.
- If a Pre-Construction Builder Runs Into Trouble, Is Your Deposit Still There?
Ontario pre-construction deposit protection works two ways: condos rely on Condominium Act trust plus a $20,000 Tarion backstop, freehold homes on tiered Tarion coverage up to $100,000, and freehold buyers must register with Tarion within 45 days from April 2026.
- How to Evaluate a Pre-Construction Condo in the GTA: Check the Builder, Count the Full Cost, Then Read the Exit
Evaluating a GTA pre-construction condo is not about the renderings. How to check a builder's licence and record, how to add deposits and development charges into a true total and compare it with resale, where assignment and delay risk sit, and how Ontario's 10-day cooling-off period works.
- How the Tarion Warranty Actually Runs: From the PDI Walk-Through to Filing a Claim in Ontario
Ontario's Tarion warranty starts automatically on your possession date, but it only helps if you file inside fixed windows. The PDI, the CCP, MyHome registration, and the three first-year statutory forms.
- How Is the Interim Occupancy Fee Actually Calculated? The Statutory Formula, Taken Apart
Ontario's interim occupancy fee is capped by Condominium Act s.80(4) at interest on the unpaid balance at the prescribed rate, plus estimated taxes and projected common expenses; O. Reg. 48/01 fixes the rate to the Bank of Canada one-year rate on the first of your occupancy month.
- Final Closing Is Not Move-In Day: Interim Occupancy, Registration and Title Transfer for Ontario Pre-Construction Condos
Getting the keys to an Ontario pre-construction condo is not the same as closing. The three stages — interim occupancy, registration, final closing — and the cash statement to check line by line against your APS.
- Don't Wait After Signing: Tarion's 45-Day Buyer Registration and Your Deposit Protection
From April 1, 2026, buyers of new freehold homes in Ontario must register their purchase with Tarion within 45 days to keep the top tier of deposit protection. Who must register, how, how much is covered, and how the 1-2-7 warranty works.
- Buying a Toronto Pre-Construction Condo? Skip the Developer Rankings and Check These Four Things Yourself
There is no reliable official ranking of Toronto condo developers. Check it yourself: HCRA licence status, Tarion enrolment and claims history, completed projects and delays or cancellations, and the key pages of the disclosure statement.
- Buying a Pre-Construction Condo? Budget for the Interim Occupancy Stretch First
Budget a pre-construction condo purchase for interim occupancy on top of price, deposits and closing funds: ask for expected occupancy and registration dates, the unpaid balance and common expense share before signing, reserve against a longer duration, and note Tarion warranty runs from occupancy.
- Buying a Pre-Construction Condo in Toronto? Ask Your Agent These Questions First, in This Order
Before you buy a pre-construction condo in Toronto, ask in the right order: what is the full total, who is the builder, and can you still walk away? The 10-day cooling-off period, disclosure, and closing costs explained plainly.
- Buying Pre-Construction: Four Things to Check — Builder, Floor Plan, Price, Contract
First time buying pre-construction in Ontario? Work in this order: check the builder's record, read the floor plan for usable space and standard finishes, turn the price into a full total, and review the contract's cooling-off and delay clauses.
- Before You Sign on a Pre-Construction Condo in Ontario: The 10-Day Window, Your Deposit, and the Closing Bill
Buying pre-construction in Ontario means signing a contract years before delivery. How the 10-day cooling-off period under s.73 of the Condominium Act really runs, where your deposits sit and how Tarion protects them, and the two waves of cost at occupancy and closing.
- Before You Sign a Pre-Construction Contract, Spend Half an Hour Checking the Builder
Check an Ontario pre-construction builder before signing: verify the HCRA licence in the Ontario Builder Directory, follow the record up to the parent company, and line up Tarion warranty, deposit protection and $150-a-day delayed occupancy compensation capped at $7,500.
- Before You Buy a New Home in Ontario, Spend Two Minutes Checking the Builder's Licence
Ontario new home builders and vendors must be licensed with the HCRA. How the HCRA differs from Tarion, what to look for in the Ontario Builder Directory, and why the name on your contract must match the licensed name.
- Before You Buy a New Home in Ontario, Check the Builder: Tarion and HCRA Records
A model suite cannot show delivery quality. How to check a builder's licence in the Ontario Builder Directory through HCRA, read Tarion warranty records and chargeable items, and which signals mean stop.
- A Leak in a New Home Is Not Just Bad Luck: What Tarion's One-, Two- and Seven-Year Warranties Actually Cover
Water problems in a new Ontario home are covered mainly in the first two Tarion warranty years. Which leaks fall in year one, year two and years three to seven — and the forms and deadlines that decide whether the repair is free.
- A Development-Charge Bill at Closing? Negotiate a Cap on Levies Before You Sign
Development charges are municipal charges for growth-related infrastructure that ultimately land in the price of a new home. How DCs, education DCs, the Tarion enrolment fee and utility connections differ — and why your closing adjustments need a cap.
Article categories
- Buying a Home427 articles
- Selling a Home220 articles
- Condos53 articles
- Renting, Landlords & Tenants177 articles
- Mortgages & Finance87 articles
- Law & Policy78 articles
- Commercial Real Estate & Leasing150 articles
- Pre-Construction & New Homes39 articles
- Market Analysis34 articles
- The Real Estate Profession20 articles
- Living & Communities31 articles
- Tax60 articles
Want to talk about your home?
You can also call directly, or scan the code to add Ming on WeChat.