Ming RenBroker · RE/MAX Realtron Realty Inc., Brokerage
☎ 647-779-9186

Pre-Construction & New Homes

Buying Pre-Construction: Four Things to Check — Builder, Floor Plan, Price, Contract

By , Broker, RE/MAX Realtron Realty Inc. (About Ming) · Published

Ming Ren · Broker · RE/MAX Realtron Realty Inc., Brokerage

← All articles · Pre-Construction & New Homes · Category guide

I am Ming Ren, a Broker with RE/MAX Realtron.

The plain conclusion first: pre-construction is judged the opposite way from a resale home. A resale home you can walk through, touch and measure. A pre-construction home exists only as drawings, a model suite and a contract dozens of pages long. So on your first visit, do not let the show suite lead. Work in this order: first, whether the builder is reliable; second, whether the floor plan will actually live well; third, turn the price into a full total; fourth, go through the contract's key clauses one by one. Keep the order, and no sales pace can rush you.

Check One: The builder — records before introductions

The biggest risk in pre-construction is not the home itself; it is whether the people building it can finish the project and finish it properly. Two free checks before you sign:

First, search the legal entity you would be contracting with in the HCRA (Home Construction Regulatory Authority) Ontario Builder Directory — licence status, number of homes built, and any discipline record. Building or selling new homes without a licence is illegal in Ontario; no record at all is a red light. Second, look at the delivery history of the builder's past projects: any stalls, cancellations or serious delays, and how after-possession service was handled. Brand size is a reference; the record is evidence. Judge each project of the same builder separately, because each is run by its own project company.

Also confirm the project's own status: is construction actually under way, or has selling only just begun? A project under construction carries far less uncertainty. If it has not started, ask where approvals and financing stand — and keep asking until the answers match documents.

Check Two: The floor plan — see the home you will actually live in

On a floor plan, what matters is not whether it looks attractive, but these easy-to-miss points:

  • How area is measured: Plan areas usually include walls, columns and sometimes a share of common space. The usable area where furniture actually fits is smaller. Ask for the real dimensions of each room, and where columns and mechanical shafts eat into corners.
  • Layout and flow: An open kitchen makes a small unit feel larger, but think through cooking smells and noise. Where bedroom doors open, whether bathrooms are enough, where storage lives — count these on the plan, because none of them can be changed after closing.
  • Orientation and windows: Balcony size, direction, and window size and placement decide light and ventilation. A north-facing or courtyard-facing unit can be a completely different home from the one described to you; confirm it on the plan yourself.
  • Ceiling height and standard finishes: Ceiling height is in the materials — confirm it. More importantly, the model suite is the upgraded version. What you receive is the standard specification list: flooring, countertops, cabinets, appliances, item by item. Price the upgrades before signing.

The contract usually also contains an area-variance clause: how much the finished unit's measured area may differ from the contract area, and what happens if it does. Easy to skip at signing; very important at closing. Understand it in advance.

Check Three: The price — compare totals, not per-square-foot rates

Pre-construction pricing misleads in two ways: both the per-square-foot rate and the headline price tell only half the story.

First, a per-square-foot rate is only meaningful against the same project, the same layout, and a similar floor and exposure; comparing it across different areas means nothing. Second, beyond the headline price there is a string of additions: whether development levies are capped; the net HST cost of a new home (owner-occupiers have a rebate, rental purchases follow a different application with different amounts and timing); condo occupancy fees during interim occupancy; upgrades; and legal fees and adjustments at closing. Only after all of that do you have the real price. Third, read the deposit schedule as a timeline: how much in total, in how many instalments, and when each falls due. Pre-construction money is locked in stages — your cash flow must meet every stage, not just the first cheque.

To judge whether the price is fair, come back to comparison: set the full total against resale homes in the same area (I work through that method in a companion article on pre-construction versus resale costs). Whatever premium remains buys the new-home warranty, new systems and your choice of finishes — if that is worth it to you, then keep talking.

Check Four: The contract — cooling-off and delay clauses matter most

The contract is your only real protection in a pre-construction deal. Watch these points:

  • Cooling-off: Buying a new condominium, section 73 of the Condominium Act, 1998 gives you a 10-day cooling-off period, counted from the latest of the dates you receive the disclosure statement, the buyers' guide and the fully signed agreement. Within it, you may rescind in writing and recover your deposits. A new freehold home is different: there is currently no statutory cooling-off period in force (the Homeowner Protection Act, 2024 contains provisions that have not yet come into force), so a freehold contract must be fully reviewed before signing — there may be no second thoughts afterwards. Day counts are often misstated online; rely on what your lawyer confirms when you sign.
  • Delay provisions: How critical dates are set, how many extensions the builder may take, what the outside date is, and what rights you have once it passes — read them one by one. Delayed-closing compensation exists under Tarion's rules when conditions are met; the terms and limits are in the critical-dates addendum to your contract.
  • Caps on charges: Levy and closing-charge caps count only if the numbers are written into the contract itself.
  • Assignment: Whether assignment is allowed, whether the builder's consent is required, and what it costs. Never assume you can assign.
  • The Warranty Information Sheet: Keep the one in your signing package — it carries your Home ID. Freehold buyers must register their purchase with Tarion within 45 days of signing to keep the maximum tier of deposit protection.

Have an Ontario lawyer experienced in new homes review the whole contract — within the 10 days for a condo, before signing for a freehold. Pre-construction contracts are not standard forms; terms differ greatly from builder to builder. This legal fee is the last place in the entire transaction to economize.

Three common misunderstandings

Misunderstanding 1: "The model suite is what I will get at closing." The model suite is the upgraded, decorated version. What you receive is defined by the contract and the standard specification list. Anything beyond that list costs extra — or is not part of the deal at all.

Misunderstanding 2: "All new homes come with a seven-day cooling-off period, so I can sign and think later." Both the number and the scope are wrong: condos have 10 days, counted from when the documents are complete; new freehold homes currently have no cooling-off period in force. "Sign first, think later" on a freehold purchase may leave you with no way back.

Misunderstanding 3: "A lower per-square-foot price than the project next door means it's a deal." That rate excludes levies, taxes and upgrades, and the total has not been compared with resale in the area. Until both are done, "a deal" is a sales line, not your conclusion.

On your first pre-construction visit, do these in order

  1. Check the contracting entity in the HCRA directory, then research the builder's delivery history on past projects.
  2. Measure the floor plan room by room; ask for usable area, orientation and ceiling height; and get the standard specification list.
  3. Build the full total: price plus levies, net HST, occupancy fees, upgrades and closing costs — then compare with resale in the same area.
  4. Copy out the deposit schedule and test it against your cash flow, instalment by instalment.
  5. Give the contract to a lawyer experienced in new homes: within the 10-day cooling-off for a condo, before signing for a freehold.
  6. Keep the Warranty Information Sheet; freehold buyers, complete the Tarion registration within 45 days of signing.

Ming Ren, Broker, RE/MAX Realtron. If you are looking at pre-construction for the first time and feel unsure, send me the project materials and the floor plan, and we will go through these four checks one by one.


This article is general information, not legal advice. The in-force status of rules such as cooling-off periods changes over time; rely on the Ontario e-Laws text in force when you sign, and consult an Ontario lawyer.

Primary sources: Condominium Act, 1998, ss. 72–73 (10-day rescission) and s. 80 (Ontario e-Laws); HCRA Ontario Builder Directory; Tarion Warranty Information Sheet and deposit protection information (tarion.com); Homeowner Protection Act, 2024 (freehold cooling-off provisions not yet in force as of November 2026), consulted November 2026.

This article in other languages: 中文فارسی

Want to talk about your home?

You can also call directly, or scan the code to add Ming on WeChat.

Ming’s WeChat QR code
Scan to add on WeChat

Community guides by city

All cities →
☎ Call MingFree Evaluation