Ming RenBroker · RE/MAX Realtron Realty Inc., Brokerage
☎ 647-779-9186

Pre-Construction & New Homes

How the Tarion Warranty Actually Runs: From the PDI Walk-Through to Filing a Claim in Ontario

By , Broker, RE/MAX Realtron Realty Inc. (About Ming) · Published

Ming Ren · Broker · RE/MAX Realtron Realty Inc., Brokerage

← All articles · Pre-Construction & New Homes · Category guide

I am Ming Ren, a Broker with RE/MAX Realtron.

The plain conclusion first: you do not buy this warranty and you do not apply for it. It starts automatically on the day you take possession. But whether it ever helps you depends on something much less automatic — whether you report problems inside a set of fixed filing windows. Telling your builder verbally does not count. Miss a window, and Tarion cannot step in for that item. This article is about the process only: when the clock starts, which forms exist in year one, and how each deadline runs.

First: the clock starts on your possession date, not your signing date

Your warranty start date is the day you take possession of the home — the closing/possession date for a freehold home, and the occupancy date for a condominium unit. The 1-year, 2-year and 7-year tiers all count from that same day.

Before you move in, your builder must walk through the home with you (or someone you designate) for the Pre-Delivery Inspection, the PDI. Take this seriously:

  • Every incomplete, damaged, missing or non-working item you find should be written on the builder's PDI Form. That form is your evidence that the condition existed before you moved in.
  • Take photos and video. Wall by wall, window by window. If there is a dispute later, photos beat memory.
  • If something promised in your agreement was swapped without your consent, raise it at the PDI — an unauthorized substitution is itself a first-year warranty matter.
  • Read the form before you sign it. Signing does not waive your rights, but an item left off the form is one you will later have to prove you did not cause.

At the PDI your builder gives you the Certificate of Completion and Possession (CCP). It carries your home's Tarion enrolment number and your possession date. It is the key to everything that follows — keep it safe.

Second: register for MyHome right away — year one has three forms

Once you have the CCP, use the enrolment number on it to register for Tarion's MyHome online portal. Every statutory warranty form goes through MyHome, and the portal reminds you of upcoming deadlines. Without the account, the process cannot run.

Year one works on three forms with connected windows (this is Tarion's current Customer Service Standard for homes with a possession date on or after May 1, 2024; earlier possessions follow the older two-form pattern — go by what your MyHome account shows):

Form You can start adding items Auto-submits What it is for
Initial Form The day after possession Day 41 Problems found in your first weeks — your first formal report to Tarion
Mid-Year Form Day 42 after possession Day 183 A second scheduled chance to report items
Year-End Form Day 183 after possession Day 365 Your last chance to report one-year warranty items

The Year-End Form has a 10-day grace period, but it is narrow: a form submitted in the grace period must be submitted manually, and you must give Tarion written evidence that you reported those items to your builder during the one-year warranty period. Treat the grace period as an emergency exit, not a plan.

My practical advice: keep a running note on your phone as you notice things, and file them when each window comes around. Do not save everything for the Year-End Form — a small defect left for six months invites the argument that you caused it through use.

Third: years two to seven have their own forms — and do not forget the delay form

After year one the forms thin out, but the deadlines still matter:

  • Second-Year Form: can be submitted during your second year, more than once, for items under the two-year warranty — water penetration, and defects in the electrical, plumbing and heating systems, for example.
  • Major Structural Defect Form: filed after year two and up to seven years from possession, for major structural defects affecting load-bearing parts of the home or its use.
  • Delayed Closing / Delayed Occupancy Form: the easiest one to forget. If your builder delayed your closing or occupancy without following the required notice rules, you may be entitled to delayed closing/occupancy compensation — and this form must be filed within one year of possession. The amounts and conditions are covered in my companion article on what the warranty covers; here the point is simply that this clock runs at the same time as your first-year warranty.

Emergencies are the exception to the windows: a serious problem such as major water penetration can be brought to Tarion at any time. That does not make ordinary items exempt from the form windows — ordinary items still live and die by the deadlines above.

Three common misunderstandings

1. "I told the site manager and the sales rep — they promised to fix it, so I'm covered." You are not, formally. A verbal promise leaves no record with Tarion. If the builder changes staff, stalls, or denies the conversation, you have nothing. By all means talk to your builder first — but when a form window arrives, every unresolved item goes into MyHome.

2. "If it wasn't caught at the PDI, it's too late to report it." It is not. The PDI Form is one piece of evidence, not the only door. Problems you discover after moving in belong on the first-year forms. The earlier you record them and the better your photos, the smoother the claim.

3. "Tarion pays me, so it doesn't matter whether the builder fixes things." The order is the other way around. The warranty is the builder's legal obligation; Tarion administers the program and steps in when the builder does not perform. The normal path is: you file, the builder repairs within the required timelines, and Tarion gets involved if that does not happen.

If you are about to take possession of a new home, do it in this order

  1. Book the PDI and attend yourself, or designate someone in writing. Go item by item, take photos, and sign the PDI Form only once it is accurate.
  2. Keep the CCP and note the enrolment number and possession date — every deadline counts from that date.
  3. Register for MyHome as soon as you can after possession, and put the three auto-submit days (41, 183 and 365) in your calendar.
  4. Record problems as you find them, with photos, and file them in each window. Do not plan around the 10-day grace period.
  5. If your closing or occupancy was delayed, add the Delayed Closing/Occupancy Form to your first-year list and file it before your first anniversary of possession.
  6. In year two, remember the Second-Year Form exists; for structural concerns, use the Major Structural Defect Form before the seventh anniversary — not after.

I am Ming Ren. If you are buying new construction and any of these dates are unclear, bring your CCP and your agreement and we will go through the calendar line by line.


This article is general information, not legal advice. Which version of the claim process applies, and your builder's repair obligations, depend on your possession date and your agreement. Confirm your deadlines with Tarion or an Ontario lawyer before acting.

Primary sources: Tarion, "Claim forms & timelines" and Registrar Bulletin 01 (Customer Service Standard, effective May 1, 2024), tarion.com; Ontario New Home Warranties Plan Act, R.S.O. 1990, c. O.31 (Ontario e-Laws). Checked November 2026.

Frequently asked questions

I told the site manager and the sales rep — they promised to fix it, so I'm covered?

You are not, formally. A verbal promise leaves no record with Tarion. If the builder changes staff, stalls, or denies the conversation, you have nothing. When a form window arrives, every unresolved item goes into MyHome.

If it wasn't caught at the PDI, is it too late to report it?

It is not. The PDI Form is one piece of evidence, not the only door. Problems you discover after moving in belong on the first-year forms. The earlier you record them and the better your photos, the smoother the claim.

Tarion pays me, so it doesn't matter whether the builder fixes things?

The order is the other way around. The warranty is the builder's legal obligation; Tarion administers the program and steps in when the builder does not perform. The normal path is: you file, the builder repairs within the required timelines, and Tarion gets involved if that does not happen.

This article in other languages: 中文فارسی

Want to talk about your home?

You can also call directly, or scan the code to add Ming on WeChat.

Ming’s WeChat QR code
Scan to add on WeChat

Community guides by city

All cities →
☎ Call MingFree Evaluation