The plain conclusion first: a pre-construction closing is not a single day. It is three stages run in relay — interim occupancy first, then the Pre-Delivery Inspection, and only after the condominium corporation is registered, final closing and title. Each stage has things that can only be done properly at that moment. A defect that never makes it onto the PDI form, a levy cap nobody negotiated at signing — catching up on either one later puts you on the back foot. This article is organized by actions, stage by stage.
Stage one: interim occupancy — move in, but get the fee in writing first
When the building is ready to live in but the condominium corporation has not yet been registered, the builder places you in interim occupancy. You live in the unit while title remains with the builder; your mortgage has not started, and each month you pay the builder an occupancy fee.
The fee is built from the same three parts in every project: interest on the unpaid balance of the price, an estimate of property taxes, and an estimate of common expenses. It resembles a mortgage payment and behaves like none of one — it repays no principal and reduces nothing you owe. How long this stage lasts depends on the building's registration progress: a few months is common, half a year or longer happens, and some projects run beyond that.
Two actions belong to this stage. First, obtain the builder's written estimate of the occupancy fee and the expected occupancy period, and schedule that cash flow in your budget, so it does not collide with the final closing balance in the same month. Second, keep the written notice of your occupancy date. Your unit's Tarion warranty clock starts on the date you take possession — you will need that exact date again and again.
Stage two: the PDI — the day's job is turning problems into writing
The Pre-Delivery Inspection (PDI) takes place before occupancy. Under the Tarion framework the builder must conduct it with you, or with a representative you designate. Its purpose is not a tour of your new home. It is to produce a signed written record of the unit's condition at the moment of handover. When you later require the builder to fix something under warranty, the PDI form is the baseline the claim is measured against.
Work through the unit room by room, in this order:
- Surfaces and hardware: scratches, cracks and damage to walls, floors and tiles; doors and windows that open, close and lock properly; cabinet doors, drawers and faucets, each one tried.
- Water and power: run every tap and check pressure and drainage; flush the toilets; test the shower; test every outlet with a phone charger; switch on every light and exhaust fan.
- Equipment and systems: confirm the HVAC, water heater and kitchen appliances actually run, as the builder demonstrates them — operating the systems is half of what the PDI is for, so ask on the spot about anything unclear.
- How to record: insist that every issue found is entered on the PDI form before you sign. Do not accept "don't worry, we'll fix it" as a substitute for a line on the form. Take your own photos and video as backup — one wide shot showing location, one close-up, for each item.
You may bring someone experienced with you. Many buyers hire a professional home inspector for the PDI; next to the price of the unit the fee is minor, and it buys a second set of trained eyes on the plumbing, electrical and HVAC items most buyers cannot judge. A representative may attend in your place, but arrange the authorization the builder requires ahead of time — not at the door.
One boundary matters here: the PDI covers your unit only. The lobby, corridors, gym, roof and other common elements are not yours to inspect or accept. They are dealt with between the condominium corporation's board and the builder, and the common elements' warranty clock runs from the corporation's registration date — a separate clock from your unit's, which runs from your occupancy date. When something in a common area fails later, the claim belongs to the corporation, not to you individually.
Stage three: final closing — audit the adjustments statement, then let the 1-2-7 warranty run
Once registration is complete and your unit has its own title, you reach final closing: pay the balance of the price, settle the statement of adjustments, receive title, and start your mortgage.
Go through the adjustments statement line by line before paying it. Alongside the balance it typically lists development levies, education levies, the Tarion enrolment fee, utility connection charges and builder disbursements — a combined figure that regularly lands in the tens of thousands of dollars. The distinction that matters: some charges are statutory, set by regulation; others are amounts the builder passes through under the contract, set by what you signed. Development levies are in the second group. Whether they are capped is decided at signing, when your lawyer can write a cap into the APS. By final closing there is nothing left to negotiate — the realistic work at this stage is verifying that every line matches the contract, including any cap. Put bluntly: most of the final closing statement was determined on the day you signed.
After closing, the Tarion warranty continues by year: one-year coverage for defects in work and materials and Building Code compliance, two-year coverage for water penetration and the electrical, plumbing and heating systems, and seven-year coverage for major structural defects. Claims run on fixed reporting windows — filing through Tarion's MyHome portal at each scheduled point (the 30-day form, the year-end form) is the reliable way to stay inside them.
An illustrative timeline with dates I made up, to show how the stages connect: suppose you take interim occupancy in March, the occupancy period runs five months, and the corporation registers and you complete final closing in August. Your one-year warranty then runs from March, your occupancy date — while the building's common-elements warranty runs from August, the registration date. The two clocks sit five months apart. When you report a problem, first decide whether it sits inside your unit or in a common element, then use the matching clock. Reporting to the wrong one wastes the window you cannot get back.
Three common misunderstandings
Misunderstanding 1: "The PDI is just the builder showing me around — a formality." The PDI is the formal record of delivery condition, with legal significance. The state of the unit you sign off on is the starting point every later warranty comparison is measured from. Treating it as a walkthrough gives away your easiest piece of evidence.
Misunderstanding 2: "If it wasn't caught at the PDI, it can never be claimed." Items missed at the PDI can still be submitted at Tarion's later reporting points, such as the 30-day and year-end forms. The PDI form is important evidence, but it is not the only door into the warranty — the real risk is missing the reporting windows themselves.
Misunderstanding 3: "The adjustments are too high — I'll negotiate them down at final closing." There is no negotiating room at closing: statutory charges are charged as prescribed, and contract charges are charged as signed. What can be negotiated — levy caps, which costs the builder absorbs — belongs in the APS at signing. At closing, your remedy is verification, not bargaining.
The checklist, in stage order
- At signing: have your lawyer review the APS, push for a cap on development levies, and confirm the expected occupancy date, occupancy period and fee estimate.
- When the occupancy notice arrives: file the occupancy date in writing (it starts your warranty clock), confirm the fee amount and payment method, and schedule the occupancy-period cash flow.
- A week before the PDI: prepare a phone, a charger, a tape measure and the floor plan; decide whether to hire an inspector; arrange authorization if a representative will attend for you.
- On PDI day: inspect room by room — surfaces, water, power, equipment — and have every issue entered on the PDI form before signing; keep a complete copy with your own photos and video.
- After occupancy: submit Tarion warranty forms at the scheduled points (30-day, year-end) and record new issues in writing as they appear, rather than saving them up.
- Before final closing: audit the adjustments statement against the contract line by line; check capped items against their caps; raise any mismatch in writing before paying.
- After closing: keep the two warranty clocks separate — your unit from occupancy, the common elements from registration — and report common-area problems to the condominium management promptly, in writing.
— Ming Ren, Broker, RE/MAX Realtron
This article is general information, not legal advice and not an official Tarion interpretation. Your contract terms and the project's timeline will affect the outcome; consult an Ontario lawyer and confirm details with Tarion before acting.
Primary sources: Tarion Warranty Corporation (tarion.com) on the Pre-Delivery Inspection and new-home warranty; Condominium Act, 1998 (Ontario e-Laws) (reviewed November 2026). The March occupancy and August registration dates are an illustrative timeline, not a real project.