I am Ming Ren, a Broker with RE/MAX Realtron.
The plain conclusion first: the biggest structural difference between a pre-construction condo and a resale home is that the condo is handed over twice. The first handover is interim occupancy — you get the keys and move in, but legally the unit is not yours yet. The second is final closing — the condominium corporation has been registered, title transfers to you, and your mortgage actually starts. The monthly occupancy fee you pay in between is the cost buyers most often forget to budget. This article follows that timeline from end to end.
First: during interim occupancy, you are living in the builder's unit
A high-rise is finished floor by floor. When your floor is ready for occupancy but the building has not yet been registered as a condominium corporation in the land registration system, the builder sets your interim occupancy date and lets you move in. Without a registered corporation there is no separate title for your unit to transfer, so title remains with the builder. For this period you are, in legal terms, occupying under the contract — not yet the registered owner.
How long interim occupancy lasts has no standard answer: a few weeks at the short end, a year or more at the long end, depending on how quickly the whole building is completed and registered. In a tall project, lower floors typically take occupancy well before upper floors — sometimes months earlier. So the question to ask when you buy is not just "when do I move in?" but "how long is the interim occupancy period expected to be?" — because every month of it carries an occupancy fee.
Second: the occupancy fee has three parts, and none of them pays down your purchase
During interim occupancy you pay the builder a monthly occupancy fee. Its nature, stated plainly: it is not a mortgage payment, it does not reduce the price you owe, and it builds no equity. Once paid, it is gone. It is assembled from three components:
| Component | What it is | What to watch |
|---|---|---|
| Interest on the unpaid balance | Interest on the portion of the price you have not yet paid — usually the large final balance | Calculated at the rate set under the contract, not at your personal mortgage rate |
| Estimated property tax | The builder's estimate of municipal tax for your unit, spread monthly | An estimate — not the city's assessed tax for your unit |
| Estimated common expenses | Your unit's estimated monthly share of the building's operating costs | Traded up against actuals once the corporation's first budget is set, around final closing |
An illustrative example with numbers I made up: at an occupancy fee of $2,600 a month, an eight-month interim occupancy period costs $20,800 — spent entirely before your mortgage even begins, with the balance of the price still fully owing at final closing. When you compare pre-construction prices, add the expected occupancy-fee months into your true cost of buying. And at signing, ask for the fee broken into its three components rather than accepting a single total.
Third: the PDI before you move in, the 1-2-7 warranty after final closing
Before you take occupancy, the builder must conduct a Pre-Delivery Inspection (PDI) with you or your designated representative. You walk the unit together and record, on the PDI form, anything damaged, incomplete, missing or not working, and both sides sign. The builder also uses the PDI to show you how the ventilation, heating and other systems operate. That signed form is the official record of the unit's condition at handover — the first piece of evidence if you later pursue a warranty claim. Photograph everything as you go, and know that you may bring someone to assist you, including a home inspector you hire, who can spot plumbing, electrical and HVAC issues that are easy to miss.
Final closing follows registration of the condominium corporation: you pay the balance and the closing adjustments, title transfers, and your mortgage begins. Tarion's new-home warranty runs in three layers from this part of the timeline: the one-year warranty covers defects in work and materials and requires the home to comply with the Ontario Building Code; the two-year warranty covers water penetration and defects in the electrical, plumbing and heating systems; the seven-year warranty covers major structural defects. The warranty is the builder's, backstopped and administered by Tarion, and it stays with the home — sell within the coverage period and the remaining warranty passes to the next owner. Each stage has its own claim forms and deadlines, so follow Tarion's schedule rather than discovering the portal only when something breaks.
Two protections sit underneath the period before occupancy: your deposits must be held in trust under the Condominium Act, 1998, with Tarion deposit protection behind them (I cover the caps and the freehold rules in a separate article), and if the builder pushes your occupancy date, Tarion's delayed occupancy compensation may apply. Confirm the current figures for both at tarion.com.
One final item that surprises buyers at final closing: the statement of adjustments. Beyond the balance of the price, the statement can include development levies, education levies, the Tarion enrolment fee, utility connection charges and builder disbursements — easily tens of thousands of dollars in total. How much of the levy portion can be passed to you is fundamentally a contract question. The effective moment to control it is at signing, when your lawyer can negotiate a cap in the APS; by final closing, the statement is simply payable. The HST treatment of a new unit, and any rebate eligibility, likewise depends on your circumstances and intended use — have your lawyer confirm both at signing.
Three common misunderstandings
Misunderstanding 1: "The occupancy fee is like paying my mortgage early — at least it goes into my own home." It does not. None of the three components reduces the balance you owe. Eight months of occupancy fees and the final closing balance are two entirely separate amounts of money.
Misunderstanding 2: "The builder promised at the PDI to fix it, so it doesn't need to go on the form." A verbal promise is the hardest kind to enforce. The PDI exists to convert the unit's handover condition into a signed written record. Items on the form are straightforward to pursue under warranty; items left off it become an argument about when the damage happened.
Misunderstanding 3: "Closing adjustments are all government charges — nothing to negotiate." Some are statutory. But how much of the development levies reaches your statement, and whether it is capped, is settled by contract. The negotiating window is at signing, not at closing — after that, the statement is simply due.
From today to final closing, do these in order
- At signing, ask three questions: the expected occupancy date, the expected length of interim occupancy, and the estimated monthly occupancy fee broken into its three parts.
- Budget the occupancy period separately: expected months multiplied by the monthly fee, listed apart from deposits and the closing balance.
- Have your lawyer review the APS at signing — in particular any cap on development levies, the HST assumptions, and the interim occupancy terms.
- Prepare for the PDI: bring a checklist and a phone for photos, inspect room by room, and have every issue entered on the PDI form before you sign, keeping your own copy.
- After occupancy, file Tarion warranty forms on Tarion's schedule (the 30-day and year-end forms among them) and put every issue in writing rather than relying on phone calls.
- When the final closing statement arrives, check each line against your contract — especially any capped items — and raise discrepancies in writing before paying.
— Ming Ren, Broker, RE/MAX Realtron
This article is general information, not legal advice and not an official Tarion interpretation. Your contract terms, the project's registration timeline and your own circumstances will affect the outcome; consult an Ontario lawyer and confirm details with Tarion before acting.
Primary sources: Tarion Warranty Corporation (tarion.com) on the Pre-Delivery Inspection, interim occupancy and the 1-2-7 warranty structure; Condominium Act, 1998 (Ontario e-Laws) (reviewed November 2026). The $2,600 monthly fee and eight-month period are illustrative figures, not a real project.