I am Ming Ren, a Broker with RE/MAX Realtron.
The plain conclusion: skipping a required permit does not save money. It defers the bill to one of three moments — an insurance claim, a municipal order, or the day you sell — and by then it comes back with interest. A permit is not municipal red tape; it is the only written proof that the work was done to code and inspected. Without it, even beautiful work is a question mark to insurers and buyers.
1. Know which work needs a permit, and which needs an electrical inspection
Under section 8 of Ontario's Building Code Act, 1992, you may not construct or demolish without a permit where one is required. Details vary by municipality, but the pattern is consistent: structural changes, additions, a change of use such as turning a basement into a separate rental unit, new or altered plumbing, and new or enlarged openings generally need a building permit, staged inspections, and a closed file at the end.
Electrical work runs on a separate track — notifications and inspections through the Electrical Safety Authority (ESA), not the municipal building department. "The wiring was changed but there is no ESA record" is a different problem from "there is no building permit," and buyers should ask about the two separately. Purely cosmetic work usually needs no permit, but when in doubt, one phone call to the municipal building department is cheaper than any cure.
2. Insurance asks earlier than you think
You must disclose material facts about the home when you insure it. An unpermitted basement rental unit, or rewiring with no inspection record, is material to an insurer. If a fire or flood is later traced to undisclosed, uninspected work, a claim can be reduced or denied — and if a tenant is hurt in an illegal unit, the landlord faces liability claims on top of repairs. What any policy pays depends on its wording and the facts, but without permits and inspection records you start every claim negotiation from a weak position.
Keep the paper: permits, passed inspection notices, and ESA certificates belong with the home's important documents. They are your strongest explanation to both your insurer and a future buyer.
3. The municipality and the resale market will both come calling
Municipal enforcement is usually triggered by a complaint, an inspection, or another permit application that exposes old work. Outcomes range from a retroactive permit — which may mean opening finished walls for inspection — to orders to fix or remove the work.
At resale, the home inspector looks at structure and wiring, the buyer's lawyer checks municipal and title records, and a renovation with no matching permit record usually ends one of three ways: the seller legalizes the work, the price drops to cover the risk, or the buyer walks. An unpermitted rental unit can also mean the rent is not recognized by a lender, which affects the buyer's financing and appraisal.
A seller's best move is disclosure plus honest pricing. A buyer's best move is to ask for permit and inspection records — and to price any gap into the offer rather than inheriting the risk for free.
Three common misunderstandings
"We have lived here for years with no problem, so it must be fine." Time and compliance are different things. No claim and no inspection so far means luck, not legality.
"Small jobs need nothing, and any electrician will do for wiring." Electrical work has its own ESA notification and inspection requirements. "An electrician did it" is not the same as "it was inspected."
"As a buyer I don't care about permits — I'll deal with it later." Your insurer and your future buyer will care. If you do not price the problem in at purchase, you have accepted the seller's risk for free.
If you run into unpermitted work, do this in order
- Request the property's permit history from the municipality and compare it, item by item, with the renovations you can see.
- Check electrical work separately: ask for ESA inspection records, and treat missing records as uninspected work with a repair cost.
- As a buyer, focus the home inspection on structure, any basement unit, and plumbing, and have your lawyer confirm municipal compliance.
- As a seller, assemble permit and inspection documents before listing, disclose what has no permit, and price it in.
- If you already own unpermitted work, ask the municipality about the path to legalize it, then update your insurance broker — before a claim, not after.
Ming Ren, Broker, RE/MAX Realtron
This article is general information, not legal or insurance advice. Permit requirements vary by municipality and policy outcomes depend on policy wording; consult your building department, insurance broker, and an Ontario lawyer.
Primary sources: Building Code Act, 1992, s. 8 and the Ontario Building Code (Ontario e-Laws); Electrical Safety Authority notification and inspection requirements; Ontario municipal building permit guidance (reviewed November 2026).
Frequently asked questions
We have lived here for years with no problem, so it must be fine?
Time and compliance are different things. No claim and no inspection so far means luck, not legality.
Small jobs need nothing, and any electrician will do for wiring?
Electrical work has its own ESA notification and inspection requirements. “An electrician did it” is not the same as “it was inspected.”
As a buyer I don't care about permits — I'll deal with it later?
Your insurer and your future buyer will care. If you do not price the problem in at purchase, you have accepted the seller's risk for free.


