Ming RenBroker · RE/MAX Realtron Realty Inc., Brokerage
☎ 647-779-9186

Buying a Home

Buying a Home With an Open Building Permit in Ontario: Deal With It Before Closing, Not After

By , Broker, RE/MAX Realtron Realty Inc. (About Ming) · Published

Ming Ren · Broker · RE/MAX Realtron Realty Inc., Brokerage

← All articles · Buying a Home · Category guide

I am Ming Ren, a Broker with RE/MAX Realtron.

The plain conclusion first: an open permit is a building permit the municipality issued but that was never formally closed by a passed final inspection. What makes it your problem is simple — as the City of Toronto puts it, the current owner is responsible for outstanding permits, including permits a previous owner took out. On closing day you take over not just the house, but the open permit, and whatever it costs in money and time to close it. This has to be checked during the conditional period and dealt with in the agreement, not discovered after closing.

First: why permits stay open

A building permit has a normal life cycle: drawings are submitted, the municipality issues the permit, work proceeds through staged inspections, and a final inspection closes the file. Almost every open permit fails at that last step. The renovation was finished, the family moved back in, and nobody ever booked the final inspection — so the permit sits open on the municipal record indefinitely. Basement finishes, backyard decks, additions, wall removals and HVAC replacements are the usual sources.

The harder version is work that was not built to the approved drawings, or that changed mid-project, so the final inspection cannot pass and the permit simply drags on. Either way, the record shows "open," and it will surface again the next time anyone applies for a new permit on the property — or when your own buyer searches the record years from now. In EPRF Holdings Limited v. Fergus Bloor Inc. (2024 ONCA 707), the Ontario Court of Appeal treated an open building permit as a defect going to the root of title, affecting the property's marketability and the ability to finance it. That is not scare language; it is case law supporting a buyer's right to insist the seller close the permit before completion.

Second: what it can block after closing

First, remediation cost. The municipality can require the current owner to complete inspections, bring work up to current code, or even open up finished work for re-inspection. Who pays? Whoever owns the house now.

Second, financing and insurance. An open permit means the compliance status of the work is unresolved. Lenders and insurers ask questions about uninspected structural and electrical work in particular, and unresolved answers can delay or complicate funding and coverage.

Third, your own resale. Leave the problem untouched and, when you sell, your buyer will run the same search and raise the same objections with you. An open permit does not fade with time; it gets handed down. Treat it as part of the purchase conditions, not as housekeeping for later.

Third: how to check — two separate tracks, municipal and ESA

Timing is the one non-negotiable: check during the conditional period, while the inspection and financing conditions are still alive and you still have leverage. Once conditions are waived, the same discovery is far harder to act on.

The municipal track: in Toronto, the City's building permit application status tool lets you search permit and inspection status by address, and for a fuller picture you can order a Property Information Report from Toronto Building, which lists active permits, violations and work orders. Other Ontario municipalities run their own permit record searches; the approach is the same — search by address, and if anything is unclear, call the building department and confirm.

The electrical track is separate. In Ontario, electrical work is regulated by the Electrical Safety Authority (ESA), not by the municipal permit system. Panel changes, new circuits and basement wiring require a notification to ESA and an ESA inspection; when the work passes, ESA issues a Certificate of Acceptance to the person who filed, and ESA itself describes that certificate as an important document for insurance and resale. If the seller cannot produce one, ask whether an electrical notification is still open. Both tracks have to come back clean before you can say the permit question is answered.

Keep unpermitted work distinct in your mind: work done with no permit at all leaves no record to find, so a clean search is not proof that everything was permitted. Compare what you see against the home's original layout and age — an obviously new basement suite, a moved structural wall — and ask the seller in writing what work was done and where the permits and inspection records are. Retroactive permitting is decided case by case by the municipality and takes longer than closing an open permit, so price that uncertainty into your negotiation.

If a search turns up an open permit, three things belong in the agreement: the seller completes the final inspection and closes the permit before completion and provides proof of closure; if that genuinely cannot be done in time, a holdback of funds until it is closed; and a clear statement of the buyer's options if the deadline is missed. A verbal promise is worth nothing here — only what is written into the agreement counts.

Three common misunderstandings

"The permit was the previous owner's, so it has nothing to do with me." The connection transfers on closing day. The municipality pursues the current owner of the property; it will not chase the former owner for you. Your account with the seller has to be settled in the agreement, before completion.

"The work was finished years ago and nothing has gone wrong, so an open permit is harmless." Nothing going wrong is not the same as compliance on record. Without a final inspection, the work is officially unresolved, and it will become a live issue when you sell, apply for a new permit, or make an insurance claim — usually at a worse time and a higher cost.

"I searched the municipal permits and they were clean, so permits are covered." Electrical is a separate system. A clean municipal record says nothing about an open ESA notification. Check both tracks, and ask for the documents for each.

If you are in your conditional period now, I suggest this order

  1. Search the municipal permit record by address — in Toronto, use the City's status tool, and order a Property Information Report if you need the fuller picture.
  2. Ask the seller in writing for permit numbers and final inspection records for past renovations, plus the ESA Certificate of Acceptance for electrical work.
  3. Have your home inspector flag, as a separate item, any work that does not match the permit record — structural and electrical items first.
  4. Write "seller to close all open permits before completion and provide proof" into the agreement, with a holdback where closure cannot be completed in time.
  5. Before waiving conditions, have your lawyer re-verify the closure status on both tracks.

Trust Professional, Diligent Work. I am Ming Ren. With permits, a search that costs very little before closing can save a remediation bill after it — we check the records clean before anyone signs off.


This article is general information only, not legal advice. Permit status and remediation requirements vary by municipality and by project; confirm with your Ontario real estate lawyer and the municipal building department's records before acting.

Primary sources: City of Toronto, Closing Building Permits and Building Permit Application Status (toronto.ca); Electrical Safety Authority, Certificate of Acceptance (esasafe.com); EPRF Holdings Limited v. Fergus Bloor Inc., 2024 ONCA 707 (Ontario Court of Appeal), consulted November 2026.

Frequently asked questions

Was the permit the previous owner's, so it has nothing to do with me?

The connection transfers on closing day. The municipality pursues the current owner of the property; it will not chase the former owner for you, so your account with the seller has to be settled in the agreement before completion.

The work was finished years ago and nothing has gone wrong, so is an open permit harmless?

Nothing going wrong is not the same as compliance on record. Without a final inspection, the work is officially unresolved, and it will become a live issue when you sell, apply for a new permit, or make an insurance claim.

I searched the municipal permits and they were clean, so are permits covered?

Electrical is a separate system. A clean municipal record says nothing about an open ESA notification, so check both tracks and ask for the documents for each.

This article in other languages: 中文فارسی

Want to talk about your home?

You can also call directly, or scan the code to add Ming on WeChat.

Ming’s WeChat QR code
Scan to add on WeChat

Community guides by city

All cities →
☎ Call MingFree Evaluation