I am Ming Ren, a Broker with RE/MAX Realtron.

The plain conclusion first: when an industrial tenant installs its own racking with its own money, a landlord can easily assume it is none of the landlord's business. Ontario law disagrees. Section 7 of Regulation 851, under the Occupational Health and Safety Act, is triggered the moment material is stored on a rack or stacking structure, and it calls for a pre-start health and safety review (PSR) by a professional engineer before the structure is used — unless a specific exemption applies and is documented. The small print on the supplier's quote, "PSR by others," is exactly this item, and if the lease does not assign it, that line is where the argument will happen.

Track one: occupational safety — the PSR and its exemption

Section 7 of Regulation 851 applies in a factory, a definition that generally captures a warehouse storing goods for gain. Item 3 of the Table to s.7 covers material, articles or things placed or stored on a structure that is a rack or stacking structure. The duty falls on the owner, lessee or employer — note that the tenant is the lessee, and an owner can be in the frame too. This is not purely "the tenant's problem."

The regulation also sets the shape of the review:

Item What s.7 requires
Who performs it For item 3, a professional engineer
Form of report Written, signed and dated, and sealed as the Professional Engineers Act requires
Content The measures to be taken to comply with the applicable provisions; for item 3, details of the structural adequacy of the structure
Who receives it A copy goes to the joint health and safety committee or health and safety representative, if any, before the structure is used

The one way out is built into the Table itself: no PSR is required if the rack or stacking structure is designed and tested for use in accordance with current applicable standards. But an exemption is not the same as no paperwork — the documentation establishing the exemption has to be kept readily accessible in the workplace. When a supplier says "this system meets the standard," what you need is the document, not the sentence.

Track two: fire — the Fire Code governs height, area and aisles

How tall the racking runs, how large each storage area is, how wide the aisles stay and whether the sprinkler design keeps up are governed by Part 3 of the Ontario Fire Code (O. Reg. 213/07) on storage, and the answer depends on what is being stored and whether the building is sprinklered. There is no single province-wide racking-height table to copy; the working method is to have the tenant's designer check the layout against Part 3 and, where it is close, confirm with the local fire department. The landlord's interest is real: a tenant who narrows aisles or stacks past the original design to gain capacity is spending the whole building's fire compliance and insurability, so the lease should keep an inspection and correction right.

Track three: building permit — ask the municipality, do not guess

Whether racking is "construction" requiring a permit under s.8 of the Building Code Act, 1992 is not answered by the statute's text alone in a way you can safely apply province-wide; the local building department's position is the practical authority. The right move is a written question, before installation, from the tenant (or whichever party the lease names) to the building department of the municipality where the unit sits, with the reply kept on file. Guessing wrong costs a tear-out after installation; asking costs an email.

Three common misunderstandings

1. "The tenant bought it and installed it, so it has nothing to do with the landlord." Section 7 names the owner, lessee or employer. The racking is also anchored into your floor slab and changes how your building stores goods, with restoration owing at the end of the term. The landlord is in this from start to finish.

2. "The supplier says it meets the standard, so no PSR is needed." Designed and tested to current applicable standards is indeed the Table's exemption — but you must hold the documentation that establishes it, kept accessible on site. A verbal assurance is, at inspection time, the same as nothing.

3. "Racking is not a building, so no permit question arises." Whether a building permit is required is a question for the local building department, not a conclusion to draw yourself. Asking is free; removing installed racking is not.

My checklist before signing and move-in

  1. In the lease: the tenant obtains the PSR or the exemption documentation, gives the landlord a copy for the file, and loads nothing until the paperwork exists.
  2. Have the tenant confirm whether the racking is designed and tested to current applicable standards: if yes, collect the proof; if no, engage a professional engineer for the PSR and file the report, with a copy to the health and safety committee or representative as s.7 requires.
  3. Check the layout — heights, storage areas, aisles, sprinkler clearances — against Part 3 of the Fire Code, and ask the local fire department where it is close.
  4. Ask the municipal building department in writing whether a building permit is required, and file the reply before ordering and installing.
  5. Add the exit terms: racking removal, repair of floor anchor holes, and the restoration standard and cost, all in the lease.

Honest in conduct, diligent in work — that is how I run my practice. I am Ming Ren. On an industrial lease, racking is cheapest to settle at the quotation stage. Send me the supplier's proposal and I will help you see whose desk that "PSR by others" line actually lands on.


This article is general information, not legal or engineering advice. A PSR must be performed by a professional engineer, and fire and permit questions rest with the local fire department and building department; verify each and consult an Ontario lawyer before signing.

Primary sources: R.R.O. 1990, Reg. 851 (Industrial Establishments), s.7 and Table item 3 (as amended by O. Reg. 434/21); O. Reg. 213/07 (Ontario Fire Code), Part 3 storage provisions; Building Code Act, 1992, s.8 (Ontario e-Laws, checked November 2026).

This article in other languages: 中文فارسی

Want to talk about your home?

You can also call directly, or scan the code to add Ming on WeChat.

Ming’s WeChat QR code
Scan to add on WeChat

Community guides by city

All cities →
☎ Call MingFree Evaluation