Ming RenBroker · RE/MAX Realtron Realty Inc., Brokerage
☎ 647-779-9186

Renting, Landlords & Tenants

Major Repairs in Your Building: Can Your Rent Go Down? Three Things to Check in Ontario

By , Broker, RE/MAX Realtron Realty Inc. (About Ming) · Published

Ming Ren · Broker · RE/MAX Realtron Realty Inc., Brokerage

← All articles · Renting, Landlords & Tenants · Category guide

I am Ming Ren, a Broker with RE/MAX Realtron.

Here is the plain conclusion first: when a landlord repairs the building, a tenant does not automatically pay less rent — but the tenant is not expected to simply put up with anything, either. Ontario's rules are detailed. First, the Board asks whether the disruption was unreasonable in the circumstances. Next, it asks whether the landlord met all ten conditions in the regulation. If all ten are met, the Landlord and Tenant Board (LTB) must not order an abatement at all. If even one is missing, an abatement becomes possible — but it is generally capped at 25% of monthly rent for each affected month, and it can never exceed 100%.

Most repair disputes I see get loud not over the work itself, but over a vague notice and missing records. Here are the three things that actually decide the outcome.

First: repairing is the landlord's duty — and so is limiting the disruption

Section 20 of the Residential Tenancies Act, 2006 (RTA) makes the landlord responsible for keeping the rental unit and the whole residential complex in a good state of repair, fit for habitation, and compliant with health, safety and housing standards — even if the problem existed before you moved in, and a lease clause cannot remove that duty. Section 21 adds that a landlord must not withhold or deliberately interfere with vital services the landlord is obliged to supply, including hot and cold water, fuel, electricity, gas, and heat from September 1 to June 15.

The other side of the coin is section 22: a landlord must not substantially interfere with a tenant's reasonable enjoyment of the unit or the complex. That protection is not limited to inside your front door — elevators, hallways and balconies count too. Section 8 of O. Reg. 516/06 calls maintenance, repairs and capital improvements "work," and tells the Board how to judge them: it must consider the effect of the work on how you and your household actually use the home, and it may only call the interference substantial if it was unreasonable in the circumstances. Noise and dust alone do not make the case — how long it lasted, which normal uses were lost, and who in the household was affected most are the facts that matter.

Second: all ten conditions met means no abatement; one miss opens the door

This is the heart of the matter, in s.8(4) of O. Reg. 516/06. Even where the Board finds substantial interference, it must not order an abatement if all of the following are satisfied:

  • Notice to tenants at least 60 days before the work began (or, in an emergency, as soon as was reasonable), and notice to any prospective tenant at the first opportunity before a new tenancy agreement was signed;
  • The notice described the nature of the work, the expected impact and the expected duration, was reasonably accurate and comprehensive when given, and was updated in a timely way if that information changed significantly;
  • The work fell within one of six necessary categories: protecting or restoring the physical integrity of the complex, complying with legally required maintenance, health, safety or housing standards, maintaining plumbing, heating, mechanical, electrical, ventilation or air conditioning systems, providing access for persons with disabilities, promoting energy or water conservation, or maintaining or improving security;
  • A building permit was obtained where the Building Code Act, 1992 required one;
  • The work was carried out at reasonable times (or within the hours a municipal noise by-law permits), its duration was reasonable in the circumstances, and the landlord took reasonable steps to minimize noise interference.

If any one condition fails, the Board moves on to amount. Under s.8(5) it weighs five factors: the nature, duration and degree of the interference; whether the tenant caused any undue delay; what steps the landlord took to minimize interference; whether the tenant used services or arrangements the landlord offered to reduce the interference; and whether failing to do the work could reasonably have been expected to cause loss of enjoyment, loss of a service, damage, a health or safety risk, or a breach of the landlord's s.20 duty.

Then come the two numbers to remember. Under s.8(6), an abatement generally cannot exceed 25% of monthly rent for each month or part of a month of substantial interference. Under s.8(7), it can exceed 25% only where the interference far exceeded what would normally be expected and at least one further problem exists — the work was outside the six categories, was done at unreasonable or by-law-prohibited times, breached a permit condition, ran far longer than normally required, or the landlord refused reasonable steps to minimize interference. Under s.8(8), it can never exceed 100% of monthly rent.

An illustrative example of my own, with figures used only to show the math: suppose rent is $2,000 a month (illustrative figure) and, for one month, a sealed balcony and a shut-down elevator are found to be a substantial interference with one condition unmet. At the general cap, the most the Board could order for that month is $500 (illustrative figure). That $500 is a ceiling, not an entitlement — the five factors set the actual percentage.

Keep two different notices separate. The 60-day notice above is about the project as a whole. Entry into your unit is a different rule: under RTA s.27, the landlord must give at least 24 hours' written notice stating the reason, the date, and a time between 8 a.m. and 8 p.m. A proper 24-hour entry notice does not satisfy the 60-day condition, and vice versa.

Third: which form, what the Board can order, and the one-year clock

Applications go to the LTB, and the clock matters first: under RTA s.29(2), no application may be made more than one year after the conduct it is about. On a long project, the earliest months can expire first — do not wait until all the work is finished.

Choose the form by the nature of the problem:

  • Form T6 (Tenant Application about Maintenance): for a landlord who has failed the s.20 repair duty. Under s.30 the Board can order specified repairs by a deadline, order an abatement, or authorize the tenant to do a repair and be repaid, among other remedies. In deciding the remedy, the Board considers whether the tenant told the landlord about the problem before applying — which is why a written repair request, with a copy kept, matters so much.
  • Form T2 (Application about Tenant Rights): for substantial interference with reasonable enjoyment, unlawful entry, or withheld vital services, under s.29(1) para. 3 and related paragraphs. Under s.31 the Board can order an abatement, compensation for damaged property and reasonable out-of-pocket expenses, an order that the conduct stop, an administrative fine, and, in serious cases, termination of the tenancy.

Two points that are easy to miss. If major work requires you to move out, a different set of rules applies — ss.53 and 54 on a tenant's right of first refusal and compensation where a tenancy is terminated for repair or renovation — and should not be mixed up with an abatement for work done while you stay. And if the landlord instead brings a rent-arrears application, s.82 lets a tenant raise, at that hearing, issues the tenant could have raised on their own application, including repair and interference issues — but the description and evidence must be given to the landlord and the Board in advance as the LTB requires, not raised for the first time at the hearing.

Three common misunderstandings

Misunderstanding 1: "The work is unbearable, so I'll just pay half rent this month." No. An abatement is ordered by the Board; it is not set by the tenant. Holding back rent on your own is treated as arrears and hands the advantage to the landlord. Pay, document, and apply.

Misunderstanding 2: "The landlord gave 60 days' notice, so I can never get an abatement." The 60-day notice is only one of ten conditions. An inaccurate notice, a missing update, work outside the six categories, or unreasonable hours or duration — any one failure means the s.8(4) bar does not apply.

Misunderstanding 3: "The cap is 25%, so I'll get at least 25%." Twenty-five percent is the general ceiling, not a floor. The Board sets the percentage from the nature, duration and degree of the interference and what each side did. A minor disruption may attract a small percentage — or none.

If a major-repairs notice goes up in your building today, do this in order

  1. Keep the original notice and the date you received it; count back from the start date to check the 60 days, and compare what the notice promised — nature, impact, duration — with what actually happens.
  2. Keep a dated daily log from day one: which days the elevator was out, how long the balcony was sealed, when the noise occurred, and who in the household was affected and how, with dated photos.
  3. Use any arrangements the landlord offers to reduce the disruption; if you cannot use one, write down why and keep it — both points go into the Board's weighing.
  4. Check each 24-hour written entry notice for compliance, and cooperate with lawful entry so no delay is laid at your door.
  5. Put your concerns and what you are asking for to the landlord in writing and keep a copy; if that fails, choose T6 or T2 by the nature of the problem and confirm you are still within one year of the earliest interference you are claiming.
  6. If you receive a notice requiring you to move out for the work, stop and check the right of first refusal and compensation under ss.53 and 54 before signing or leaving.

I am Ming Ren. With major repairs and abatements, bring the notice and your records first — we will go through the sections and the dates one by one.


This article is general information, not legal advice. The category of the work, the content of the notice and your timeline will affect the result; consult an Ontario lawyer or legal clinic before acting.

Primary sources: Residential Tenancies Act, 2006, S.O. 2006, c.17, ss.20, 21, 22, 27, 29–32, 54, 82; O. Reg. 516/06, s.8 (Ontario e-Laws, checked November 2026); LTB Form T2 and T6 information (Tribunals Ontario). The $2,000 rent and $500 abatement figures are illustrative only, not a real case.

Frequently asked questions

The work is unbearable, so can I just pay half rent this month?

No. An abatement is ordered by the Board; it is not set by the tenant. Holding back rent on your own is treated as arrears and hands the advantage to the landlord. Pay, document, and apply.

The landlord gave 60 days' notice, so can I never get an abatement?

The 60-day notice is only one of ten conditions. An inaccurate notice, a missing update, work outside the six categories, or unreasonable hours or duration — any one failure means the s.8(4) bar does not apply.

The cap is 25%, so will I get at least 25%?

Twenty-five percent is the general ceiling, not a floor. The Board sets the percentage from the nature, duration and degree of the interference and what each side did. A minor disruption may attract a small percentage — or none.

This article in other languages: 中文فارسی

Want to talk about your home?

You can also call directly, or scan the code to add Ming on WeChat.

Ming’s WeChat QR code
Scan to add on WeChat

Community guides by city

All cities →
☎ Call MingFree Evaluation