A Federal Pipeline Near Your Home? Stop Before You Dig: Most Ground Disturbance Within 30 Metres Needs Written Consent

By , Broker, RE/MAX Realtron Realty Inc. (About Ming) · Published

Ming Ren · Broker · RE/MAX Realtron Realty Inc., Brokerage

← All articles · Buying a Home · Category guide

I am Ming Ren, Broker at RE/MAX Realtron.

The conclusion first: if a federally regulated oil or gas pipeline runs near your home, the strip of land 30 metres on each side of the pipe's centreline is the "prescribed area." Inside that area, any ground disturbance that reaches 30 centimetres deep or more — fence post holes, deck footings, a pool excavation, regrading — requires the pipeline company's written consent (or an order of the Canada Energy Regulator's Commission) before you start. Digging first and explaining later is the most expensive way to learn this.

First: find out where the pipe is, and how far it is from you

The prescribed area is not drawn from the fence line or the edge of the right-of-way. It is measured 30 metres out from the centreline of the pipe, on both sides, whether or not a right-of-way exists there. Where several pipes share a corridor, it is measured from the outermost pipes.

The problem is that the pipe is underground and invisible from the surface. So the first step is never digging — it is checking. At least three working days before any ground disturbance, submit a locate request through Click Before You Dig or your local one-call centre. A federally regulated pipeline company must confirm and mark the pipe's location within three working days (or a mutually agreed time), explain what the markings mean, and give you its safety requirements in writing.

The same applies when buying: if a pipeline corridor runs near the property, establish the pipe's location, the right-of-way, and any easement registered on title before closing — not on the day you start planning a pool and discover the line runs under your backyard.

Second: what needs consent, and what does not

Under the CER's Damage Prevention Regulations – Authorizations, the main activities that need prior written consent are:

  • an activity that causes a ground disturbance in the prescribed area — the working threshold is digging 30 cm or deeper;
  • cultivation 45 cm or deeper;
  • constructing or placing a facility across, on, along or under a pipeline — a fence, garage, shed, pool or wood pile on the right-of-way needs consent even if the digging is shallow;
  • operating a vehicle or mobile equipment across the pipeline (a crossing), which has its own authorization requirement.

On the other side, maintenance that does not disturb the ground, or digs less than 30 cm — planting flowers, shallow gardening — generally does not need consent. But note the stricter rule inside the right-of-way itself: within the right-of-way you need written consent before you dig or build anything, so do not apply the "under 30 cm" logic to work inside the right-of-way.

Consent is not a rubber stamp. Before consenting, the company must satisfy itself the activity will not damage the pipe; once it consents, it must give you written information on how to work safely. If the company refuses, or you cannot agree on terms or costs, the CER offers alternative dispute resolution, and you can also apply to the Commission under section 335 of the Canadian Energy Regulator Act. There is more than one road — but every road starts with authorization before disturbance.

One hard line: mechanical excavation causing a ground disturbance within 3 metres of the pipe is not allowed unless you follow the specific measures set out in the regulations. The closer to the pipe, the stricter the rules — that is the text, not a matter of experience.

Third: why this matters so much to a homeowner

Safety comes first. Striking a high-pressure gas or oil line is not something money settles; it can kill people and contaminate land. That is the entire reason the damage prevention regime exists.

Second, money and liability. Costs directly caused by authorized work are allocated by the rules and any agreement you reach; unauthorized disturbance, or working outside the consent conditions, can bring CER administrative monetary penalties, and repairing a damaged pipe is a different ledger again.

Third, time and transactions. An example I made up: a homeowner signs a contract in spring to have a pool dug in June, submits a locate request in May, and learns the pool sits inside the prescribed area and needs written consent — drawings change, the pool moves, the summer is gone. Had the locate and a call to the company happened before signing, all of it could have been solved on paper. Nobody compensates you for that delay; the rules were always there, just unread.

For buyers, my added advice: in neighbourhoods with a pipeline corridor, put "where is the pipe, how much of my yard is in the prescribed area, and can I still build what I plan" on your due-diligence list. For sellers: disclose what you know about the pipeline and the right-of-way honestly — the buyer's lawyer will likely find it on a title search anyway.

Three common misunderstandings

Misunderstanding 1: "The pipe is in the right-of-way and my yard isn't, so this has nothing to do with me." Wrong. The prescribed area runs 30 metres from the centreline regardless of the right-of-way. Your yard can be outside the right-of-way and well inside the prescribed area, where digging 30 cm or more still needs written consent.

Misunderstanding 2: "I called for locates and the ground is marked, so I can dig." A locate tells you where the pipe is; it does not authorize you to dig. Ground disturbance at or over the threshold still needs the pipeline company's written consent (or a Commission order). Two steps, neither optional.

Misunderstanding 3: "It's just a few fence post holes — too small for anyone to care." Fence post holes and deck footings are the very examples the CER names. A shallow hole is not automatically under 30 cm. Measure the depth, check the area, then decide about consent — in that order.

If you are about to dig in your yard, do it in this order

  1. Check before you dig: at least three working days ahead, submit a locate request through Click Before You Dig or a one-call centre, and confirm the pipe's exact location and what the markings mean.
  2. Measure two numbers: how far your work is from the centreline (inside the 30 m prescribed area? inside the right-of-way?) and how deep you will dig (30 cm or more? cultivation at 45 cm or more?).
  3. If you meet a threshold, apply to the pipeline company for written consent, submitting your method, depth and schedule honestly, and wait for the consent and safety information before starting.
  4. If you cannot reach agreement with the company, do not proceed anyway: contact the CER about alternative dispute resolution, or apply to the Commission under section 335.
  5. During the work, follow the consent conditions and the markings exactly; if a marking is unclear or a location is in doubt, stop and re-confirm — mechanical excavation within 3 metres of the pipe demands special care.
  6. When buying, put the pipe's location, the right-of-way and any easement into your due diligence; when selling, disclose what you know about the pipeline instead of letting the buyer discover it on pool day.

I am Ming Ren. What you cannot see underground deserves the most care: pin down where the line runs first, and then we can talk about what to do with your yard.


This article is general information, not legal advice. It covers federally regulated (CER) pipelines only; provincially regulated pipelines and municipal utilities follow other rules. Confirm your case with an Ontario lawyer, the CER, or the pipeline company.

Primary sources: Canadian Energy Regulator Act, s. 335; Pipeline Damage Prevention Regulations – Authorizations, ss. 2, 7, 10; Canada Energy Regulator damage prevention guidance on the prescribed area and written consent (reviewed November 2026). The pool example is illustrative, not a real case.

Frequently asked questions

The pipe is in the right-of-way and my yard isn't — does this affect me?

Yes, it can. The prescribed area runs 30 metres from the centreline regardless of the right-of-way. Your yard can be outside the right-of-way and well inside the prescribed area, where digging 30 cm or more still needs written consent.

I called for locates and the ground is marked — can I dig?

A locate tells you where the pipe is; it does not authorize you to dig. Ground disturbance at or over the threshold still needs the pipeline company's written consent (or a Commission order). Two steps, neither optional.

It's just a few fence post holes — too small for anyone to care?

Fence post holes and deck footings are the very examples the CER names. A shallow hole is not automatically under 30 cm. Measure the depth, check the area, then decide about consent — in that order.

This article in other languages: 中文فارسی

Want to talk about your home?

You can also call directly, or scan the code to add Ming on WeChat.

Ming’s WeChat QR code
Scan to add on WeChat

Community guides by city

All cities →
☎ Call MingFree Evaluation