I am Ming Ren, a Broker with RE/MAX Realtron.
The plain conclusion first: many owners assume asbestos is the contractor's problem. It is not. Ontario Regulation 278/05, made under the Occupational Health and Safety Act, puts two standing duties on the building owner — one for ordinary times, one for the moment work is planned. And the exemption people like to quote is for owner-occupied homes. A commercial building does not get it.
Duty one, in ordinary times: the record, the notice, the inspections
Under section 8, once you know — or ought reasonably to know — that asbestos-containing material (material with 0.5 per cent or more asbestos by dry weight) was used in the building, or you choose to treat a material as asbestos-containing, the management duties switch on:
- Keep a record on the premises stating the location of the material, whether it is friable or non-friable at each location, and for sprayed-on friable material, the type of asbestos or a statement that it will be treated as containing a type other than chrysotile.
- Notify occupiers in writing of the information in the record that relates to the part of the building they occupy. Your tenants are occupiers.
- Inspect at reasonable intervals to check the condition of the material.
- Update the record at least once in every 12-month period, and whenever new information arrives.
One scenario deserves its own warning: friable fireproofing or insulation that has fallen. Section 8 requires work that would disturb it to stop, the material to be examined, and then clean-up and repair, sealing, removal or enclosure as the result requires. Having a cleaner sweep it up is the classic way a small problem becomes a large one.
Duty two, before work starts: the section 10 report
Under section 10, before an owner requests tenders for, or arranges, the demolition, alteration or repair of all or part of a building, the owner must have a report prepared stating whether any material that may be handled, disturbed or removed is or is not asbestos-containing material. A copy of the complete report goes to the prospective constructors, and flows down to contractors and subcontractors.
The order matters: report first, tender second. When your tenant's contractor asks "where is the asbestos report," the regulation expects the owner's side to have it ready. For tenant fit-out work, the lease should still say who arranges the examination for the areas being disturbed, who pays, and that a copy of the report comes back to the owner — the regulation sets the floor, the lease divides the work, and neither should be left blank.
Does the regulation even cover your building?
Section 2 applies the regulation to buildings and their owners; the exemption in s.2(4) is confined to an owner-occupied home and an owner-occupied residential building with four or fewer units. A rented commercial building — and a rented residential building — should not count on it. The age of the building is not a shield either: the trigger is what you know or ought reasonably to know, and an older building's renovation and materials history is itself a source of what you ought to know.
Three common misunderstandings
1. "No renovation planned, so asbestos is not my issue." The section 8 record, notice and inspection duties are ongoing. They do not wait for a construction project.
2. "The contractor pays for and prepares the asbestos report." The section 10 report is the owner's to have prepared before tendering or arranging the work, and to give to prospective constructors. How costs are shared in a lease is a separate negotiation; the "report first" step sits with the owner.
3. "My building is rented homes, so the household exemption helps." The exemption is for owner-occupied homes. A rented building does not qualify — build the record instead of arguing the exemption.
My checklist if you have just taken over an older commercial building
- Review the building file and renovation history for any sign asbestos-containing material may have been used; if in doubt, have a qualified firm complete a full examination.
- Build the section 8 record, keep it on the premises, and give written notice to every occupier.
- Put the 12-month update and the periodic inspections in a calendar, not in memory.
- Before any demolition, alteration or repair — including a tenant's fit-out — run section 10 first: examination, report, copy to the prospective constructor, copy kept on file.
- If material has fallen, stop the disturbing work, have it examined, then deal with it — never sweep first.
Honest in conduct, diligent in work — that is how I run my practice. I am Ming Ren. In the sale or leasing of an older commercial building, whether the asbestos record exists is a real due-diligence item. Send me the building's age and renovation history and we will work through it line by line.
This article is general information, not legal advice. Asbestos examination, sampling and removal must be done by qualified persons under the regulation; consult an Ontario lawyer and a licensed environmental consultant for your case.
Primary sources: O. Reg. 278/05 (under the Occupational Health and Safety Act), ss.2, 8 and 10; Ontario Ministry of Labour, Guide to the Regulation Respecting Asbestos on Construction Projects and in Buildings and Repair Operations (Ontario e-Laws and ontario.ca, checked November 2026).