I am Ming Ren, a Broker with RE/MAX Realtron.
Here is the plain conclusion first: listing a home does not start with photos or price. It starts with checking the small facts. A wrong area figure, a missing document, or a renovation whose permit status nobody can explain can all be sorted out in half a day before listing. Left until a buyer and the buyer's lawyer start asking, they become reasons to chip the price — or reasons a deal stalls. This checklist is what I walk through with sellers before a listing goes live.
1. Get the documents in hand first — buyers will ask for them anyway
Start with the basics: the property tax bill, utility bills, rental contracts for equipment such as a furnace or hot water tank if any are rented, and invoices for major repairs or replacements. These are not decoration. A buyer's lawyer uses them to confirm costs and to see which equipment is rented and which is owned. If a water heater is rented, say so in writing — do not let that surface at closing, when someone learns the contract has to be transferred or bought out.
Condos need one more step: the status certificate. Under section 76 of the Condominium Act, 1998, anyone may request a status certificate for a unit from the condominium corporation. The corporation must provide it within 10 days of receiving the request and payment, and the fee is capped at $100 including taxes, as the Condominium Authority of Ontario explains. The certificate sets out the unit's common expenses, any arrears, the corporation's budget, the state of the reserve fund, and any special assessments — and what it says binds the corporation. So if you are selling a condo, order it early instead of waiting for an offer. The sooner a buyer and their lawyer can review it, the less uncertainty sits inside the condition period.
The third group is renovation and permit records. If you added space, finished a basement, changed the structure, or altered plumbing or electrical work, find the municipal building permit and the inspection sign-offs. In Ontario, a building permit is generally required before you construct, renovate, demolish, or change the use of a building, and municipalities review and inspect the work under the Building Code. If you can produce the permit and its closure records, "was this basement done legally?" has a documented answer. If you cannot, say you cannot — plainly. Never describe work as permitted when you have no record of a permit.
2. Area and floor plan: do not copy a ready-made number
The figure most likely to be wrong in a listing — and the easiest for a buyer to catch — is the area.
MPAC's number cannot simply be used as the listing area. MPAC explains that it measures the exterior of the home, that the basement, garage, porch and deck are not included, and that the figure serves property tax assessment — it is not a measurement prepared for a sale listing. Put an assessment figure in a listing and a buyer who measures the usable interior space will get a different number. Trust is lost first, and every negotiation after that gets harder.
The safer approach: before listing, have the home measured again under a standard you can state out loud, or at minimum check it room by room yourself, and write down where the number came from, what method was used, and whether the basement is included. Add a clear floor plan with dimensions for each room. Photos give a buyer a general impression; a floor plan lets them check before booking a showing whether their furniture fits and whether the layout works, which cuts down on wasted showings. An illustrative example: if a principal bedroom is shown as 3.6 m × 4.2 m (illustrative example), a buyer can measure their own bed and wardrobe at home and arrive already knowing it works. That does more than a set of wide-angle photos.
While you are at it, verify the small facts: parking and locker numbers (for a condo, match them against the corporation's records), lot size, the age of the furnace and air conditioner, and roughly when the roof was last replaced. Write down only what you have checked. If you do not know, write that you do not know — do not estimate and fill it in.
3. Disclosure: say what must be said early, and do not guess at the rest
Ontario has no mandatory seller disclosure form. The Seller Property Information Statement (SPIS) is voluntary, not legally required — RECO is clear on that. But two points matter. First, if you choose to complete an SPIS, every answer must be accurate to the best of your knowledge; a wrong answer can be treated as a misrepresentation. Second, not completing an SPIS does not mean nothing has to be disclosed.
RECO's guidance divides defects into two kinds. A patent defect — one a buyer can see on a viewing or a home inspection can find, such as an obvious crack — generally does not have to be pointed out by the seller, but it must never be covered up. A latent defect is different: if the seller knows of a hidden problem that would make the home unfit for habitation, dangerous, or potentially dangerous, it must be disclosed. If you are not sure whether a problem you know about falls into that category, do not decide alone. Ask your lawyer, or at least talk it through with me before deciding how to present it.
In practice, I ask sellers to sit down before listing and write out every problem they know about on one sheet: any past leaks and how they were repaired, any basement moisture, any dispute with a neighbour that affects the property. The point of the list is not to scare buyers off. It is to decide, calmly and in advance, what goes into the listing material and what gets explained up front. What buyers resent most is not a flaw in the house — it is learning after the fact that the seller knew and said nothing.
Common misunderstandings
1. "If I don't complete an SPIS, I don't have to disclose anything." Wrong. The SPIS is voluntary, but the duty to disclose a known latent defect that makes a home dangerous or unfit for habitation does not disappear because no form was filled in.
2. "MPAC's area is the official number, so copying it is safest." MPAC's area is an assessment figure, measured from the exterior and excluding the basement and other areas. It is official, but it was not prepared as a listing measurement, and copying it is exactly how a listing ends up disagreeing with a buyer's own measurement.
3. "A small renovation needed no permit, so it never needs mentioning." Whether a permit was required depends on the work itself, judged by the municipality under the Building Code — not on how much it cost. If structural, plumbing, electrical, or change-of-use work was done and you have no permit record, say so honestly instead of assuring a buyer there is "no problem."
Action checklist before going live
- Gather the tax bill, utility bills, equipment rental contracts, and major repair invoices; label every rented item.
- If selling a condo, order the status certificate early and confirm the common expenses, arrears, and any special assessments.
- Find the building permits and inspection records for past renovations; where none exist, note that honestly — do not invent them.
- Re-check the area: state the measurement method and source, make clear whether the basement is included, and do not copy the MPAC figure.
- Prepare a floor plan with dimensions, and verify room, parking, and locker numbers one by one.
- Write out every problem you know about on one sheet and decide how each will be disclosed; ask a lawyer about anything you are unsure of.
- If you complete an SPIS, answer every question to the best of your knowledge, then read the whole form again before signing.
- Read the finished listing material once more end to end: every number, year, and statement should have a source or a basis you can point to.
A careful checklist will not make a house bigger. But a buyer who trusts the paperwork is a buyer who offers seriously. Checking the small things first is the cheapest form of diligence in a sale.
Honest work, done properly. — Ming Ren, Broker, RE/MAX Realtron
This article is general information only and is not legal advice. For questions about disclosure duties, permits, or your contract, consult an Ontario real estate lawyer.
Primary sources checked: RECO Bulletins 7.3 and 7.4 and RECO's property information statement guidance; Condominium Act, 1998, s. 76, and the Condominium Authority of Ontario's status certificate guidance; MPAC, "How we assess residential properties"; Building Code Act, 1992, and Ontario's building permits guide (ontario.ca).
Frequently asked questions
If I don't complete an SPIS, do I have to disclose anything?
Wrong. The SPIS is voluntary, but the duty to disclose a known latent defect that makes a home dangerous or unfit for habitation does not disappear because no form was filled in.
MPAC's area is the official number, so is copying it safest?
MPAC's area is an assessment figure, measured from the exterior and excluding the basement and other areas. It is official, but it was not prepared as a listing measurement, and copying it is exactly how a listing ends up disagreeing with a buyer's own measurement.
A small renovation needed no permit, so does it never need mentioning?
Whether a permit was required depends on the work itself, judged by the municipality under the Building Code — not on how much it cost. If structural, plumbing, electrical, or change-of-use work was done and you have no permit record, say so honestly.


