I am Ming Ren, a Broker with RE/MAX Realtron.
The plain conclusion first: if you find a home that is right on location and price but tired inside, you can put the renovation money and the purchase price into one mortgage, lent against the home's value after the work is done — instead of financing the renovation separately at much higher cost. These arrangements are commonly called Purchase Plus Improvements; CMHC's insured version is CMHC Improvement. Three rules decide whether it works for you: how the lending value is calculated, the fact that the renovation money does not arrive on closing day, and a 10% line that governs how the money is released.
1. What value does the lender lend against?
An ordinary mortgage is based on the property's value as it stands. A purchase plus improvements mortgage is based on the as-improved value — what the home is expected to be worth once the planned work is complete. But CMHC's formula has a cap. The lending value is the lesser of:
- the appraised as-improved value; or
- the as-is value plus the cost of the improvements.
In other words, an inflated renovation budget cannot inflate the loan. Spend $50,000 on work that adds $30,000 of value, and the lending value follows the lower figure. Your down payment is calculated on that lending value, under the same tiered minimum down payment rules as other insured mortgages.
On size: under CMHC Improvement's current published terms, insured financing can reach up to 95% of the as-improved value for owner-occupied properties of 1–2 units, and up to 90% for 3–4 units, and the maximum purchase price or as-improved value for homeowner loans must be below $1,500,000. Other insurers, such as Sagen and Canada Guaranty, run their own versions with their own limits and advancing arrangements — confirm each insurer's terms separately. This article follows CMHC's published wording only; do not carry one insurer's numbers into another's program.
An illustrative example only, with invented numbers: a home's as-is value is $600,000, the planned renovation costs $50,000, and the appraiser puts the as-improved value at $660,000. Compare the two measures: as-improved value $660,000, versus as-is value plus improvement cost, $650,000. The lending value is the lower one, $650,000. At a maximum 95% loan-to-value, the loan ceiling is about $617,500 — not 95% of $660,000. That $10,000 difference is the formula's cap doing its work.
2. The renovation money does not arrive on closing — bridging cash is the price of admission
This is the step most buyers get wrong. On closing day the lender advances the purchase portion. The improvement portion is held back and released only after the work is done and the lender confirms completion. In between, either you front the contractor's invoices, or you negotiate a payment schedule with the contractor that matches the release schedule. Starting this product without a cash-flow plan is the most common way it goes sideways: the work stalls halfway, waiting for money that was never going to arrive early.
How the money is released depends on the size of the job. Under CMHC's published terms, the dividing line is the improvement cost as a share of the as-improved value:
- 10% or less: a single advance — released once, after the work is complete and confirmed;
- More than 10%: progress advances — released in stages as the work progresses. Under CMHC's Full Service option, CMHC validates up to four consecutive advances at no cost; under Basic Service, the lender validates advances itself without CMHC pre-approval.
Either way, keep everything: contracts, invoices, proof of payment, and completion photos. Release of funds depends on the lender being able to verify that the work you said you would do was actually done.
3. The quotes must come before the offer firms up
The approval logic of this product is "approve the work, then approve the money." The lender and the insurer set the lending value and the advance amounts from a specific scope of work supported by written contractor quotes. So the correct sequence is: get written quotes while you are still shopping — items, unit prices, total, timeline — and submit them with the mortgage application, so the improvement arrangement is approved inside your financing condition, before you waive it.
Do it backwards — close first, collect renovation quotes later — and this product is usually no longer available, leaving costlier financing as the fallback. Also build in an overrun buffer. Renovations on older homes routinely uncover hidden work — plumbing, wiring, structure. The lending value is capped at the approved budget, so overruns come out of your own cash. Carrying a contingency of roughly a tenth of the budget is far cheaper than scrambling for money mid-project.
A simple fit test: the work is a mid-sized, clearly quotable project — kitchen, bathrooms, flooring, windows, heating — that can be verified when complete, and you have bridging cash or a contractor who accepts the release schedule. That fits. A gut renovation, or no bridging cash at all — do not start down this road.
Three misunderstandings I hear most often
"The renovation money lands in my account on closing day." It does not. The improvement funds are held back and released after the work is completed and confirmed. Scheduling a contractor against money you expect at closing strands the project in its first week.
"A bigger renovation budget means a bigger loan." No. The lending value is the lesser of the as-improved value and the as-is value plus improvement cost, and the as-improved value is set by appraisal, not by your budget.
"Any renovation can go into this product." It is built for improvements that add verifiable value to the property, and each insurer's rules on eligible work, caps, and advancing differ. Take your quote to the lender and confirm the project qualifies before you firm up the purchase — not after.
If you want to use this route, do these six things in order
- While viewing homes, lock the renovation scope to what must be done before you move in and can be firmly quoted. Push major redesigns and future projects off the list.
- Before you offer, get written contractor quotes — items, unit prices, total, and timeline — and carry a contingency of roughly 10% for overruns.
- Submit the purchase and the renovation quotes to your lender together. Confirm which insurer's product applies, how the lending value will be set, and whether advances will be single or progress.
- Plan the bridging cash explicitly: between closing and release, who pays the contractor, and how much? Build that schedule into the contractor's contract.
- During the work, keep contracts, invoices, payment records, and completion photos together — the release verification runs on this file.
- The day the work is done, notify the lender and arrange completion confirmation and release. Every extra day is a day your bridged money stays out.
Trust Professional, Diligent Work. I am Ming Ren. You can buy the older house — but run new numbers: lending value, bridging cash, and the release schedule aligned before you sign.
This article is general information only, not mortgage advice. Insurer and lender caps, advancing arrangements and approval requirements change; confirm the current written terms with your lender before applying.
Primary source: CMHC (cmhc-schl.gc.ca), CMHC Improvement program description — as-improved value and lending value formula, maximum loan-to-value, and the 10% threshold between single and progress advances (consulted November 2026). The $600,000, $50,000 and $660,000 figures are illustrative only, not a real transaction; other insurers' specific caps are not quoted here and must be checked individually.