Ontario New-Home PDI: The Form Is a Record, Not a Repair Order

By , Broker, RE/MAX Realtron Realty Inc. (About Ming) · Published

Ming Ren · Broker · RE/MAX Realtron Realty Inc., Brokerage

← All articles · Buying a Home · Category guide

I am Ming Ren, a Broker with RE/MAX Realtron.

Here is the plain conclusion first: the most valuable thing you take away from a PDI (Pre-Delivery Inspection) is not the builder's promises to fix things — it is the signed PDI Form itself. Under the Tarion system, that form is the official record of your home's condition before you moved in. If you and the builder later argue about whether a scratch was there before possession or happened during your move, Tarion can refer back to that form. So treat those one or two hours as evidence-gathering, not as a house tour.

First: what a PDI is — and what it is not

In Ontario, every new home enrolled with Tarion must have a PDI, led by the builder, before you take possession. Anything damaged, incomplete, missing or not operating properly — and anything that cannot be assessed because it is obscured or inaccessible — goes on the PDI Form. You (or your designate) and the builder both sign it, and you keep a copy.

A few points people mix up, stated once:

  • The PDI Form is not a warranty claim. Tarion is explicit: the form records condition; it is not a request for warranty service. If an item on the form is still not fixed after you move in, you must list it again on a warranty form before the builder's repair obligations are formally triggered.
  • Who may attend. You must attend yourself, or send a designate in your place. Tarion places no restriction on who a designate can be — a family member, a friend, your agent, or a professional home inspector all qualify. If you are not attending personally, complete Tarion's Appointment of Designate form and give it to the builder in advance or at the PDI, so your designate can sign the PDI Form and the CCP on your behalf.
  • The CCP and your warranty start date. On PDI day you also sign the Certificate of Completion and Possession (CCP). The possession date recorded on it is your warranty start date, and every warranty deadline runs from that date. Put it in your calendar.
  • The builder must explain the systems. A PDI is not only about defects. The builder should also show you how the heating, ventilation, plumbing and electrical systems work. Tarion notes that using the systems improperly could affect your warranty coverage, so the walkthrough is worth taking notes on.

Second: how to inspect — by systems and stages, not room by room

Many buyers work through a room-by-room list, run out of energy halfway, and rush the mechanical checks at the end. I suggest a different order, in four stages:

Stage one: documents first, then the house. Bring your Agreement of Purchase and Sale (APS) and your selections and upgrades list through the door. First verify that what you paid for is actually there — the countertop, flooring, fixtures and appliance models, in the right colours and specifications. Tarion specifically says unauthorized substitutions of items in your purchase agreement should also be noted on the PDI Form — and you cannot catch a substitution from memory; you catch it against the contract.

Stage two: surfaces and moving parts. This pass covers everything you can see, touch and operate: scratches and dents in floors and counters, cracked or hollow-sounding tiles, paint finish; then open and close every door and window yourself and check that locks engage and seals close properly. Each time you find something, watch the builder write it on the form, and take a photo — photos can be submitted to Tarion later.

Stage three: run every system. This is the pass you cannot afford to skip. Run the furnace and the air conditioner and listen; run every tap and flush every toilet, checking pressure and drainage and feeling pipe joints for dampness; test outlets with a phone charger, and press the test button on kitchen and bathroom GFCI outlets; power up every appliance included in your contract. Mechanical problems often fall under the two-year warranty, but finding them on PDI day and getting them on the form gives you the cleanest evidence.

Stage four: the exterior, and whatever you cannot see. Outside, look at the brickwork and siding, whether window screens are installed, and the finished condition of the driveway and landscaping. Pay special attention to anything the day itself prevents you from checking — a driveway or roof under snow, an attic you cannot enter. Do not treat those as "fine by default": have them recorded on the form as unable to be assessed. Tarion's position is that items that cannot be assessed belong on the form too.

Third: after the PDI, the real warranty clock starts

Signing the form and getting the keys is only the beginning. Register for Tarion's MyHome portal soon after possession — that is where all warranty forms are submitted. Under the timeline Tarion currently publishes, the first year gives you three submission points:

  • Initial Form: you can begin adding items the day after possession, and the form is automatically submitted on day 41. Move every unresolved PDI item onto this form right away — the PDI Form does not convert itself into a work order.
  • Mid-Year Form: you can add items from day 42, and it is automatically submitted on day 183. This is your mid-year opportunity to report further items.
  • Year-End Form: you can add items from day 183, and it is automatically submitted on day 365. This is your final opportunity to report one-year warranty items, and only one Year-End Form will be accepted, so missing it can affect coverage. There is a 10-day grace period after day 365, but a form submitted in the grace period must be submitted manually, and you must give Tarion written evidence that you reported the items to your builder during the first year — one more reason to keep your builder communications in writing.

In the second year there is the Second-Year Form (for two-year warranty items; more than one may be submitted during that year), and in years three to seven the Major Structural Defect Form. If your home's warranty start date is earlier and an older set of forms applies to it, go by the forms and deadlines MyHome shows for your home — do not borrow dates from someone else's purchase.

Common misunderstandings

"Once it's on the PDI Form, I've claimed it and the builder has to fix it." No. The PDI Form is a record only. Items still unresolved after move-in must be listed on a warranty form — the Initial Form first — to count as a formal request for warranty service. Writing it on the PDI Form and never filing a warranty form is the most avoidable way to lose leverage.

"A scratch that isn't on the PDI Form can never be claimed." Not quite. Tarion's position is that failing to note an item does not necessarily affect your warranty coverage. The real problem is proof: for unrecorded surface damage, the builder can easily argue it happened after you moved in. So the lesson is not "miss it and it's over" — it is "one extra line on the form today saves a month of arguing later."

"Only I can attend — bringing a home inspector breaks the rules." It does not. There is no restriction on who your designate may be, and a professional home inspector can attend as your designate and even sign for you, provided the Appointment of Designate form is given to the builder as Tarion requires, in advance or at the PDI. If you attend personally, you may also bring someone with you — confirm numbers and site requirements with the builder ahead of time.

"For areas I can't see, leaving the form blank is fine." A blank means "no issue noted." Snow-covered surfaces, areas blocked by materials, and spaces you cannot enter should be written on the form as unable to be assessed. That notation is itself a record.

On PDI day, I suggest you do these things in order

  1. Print your APS and your selections and upgrades list and bring them; if you cannot attend, arrange the designate appointment form in advance.
  2. Bring small tools: a phone charger (for testing outlets), a flashlight, a tape measure, and your phone for timestamped photos.
  3. Start by checking selections and substitutions against your documents, then work through surfaces, systems and the exterior, leaving enough time for the systems pass.
  4. For every problem, watch it being written on the PDI Form before moving on; if a description is vague, ask for the location and condition to be spelled out, and match it with a photo.
  5. List every item you could not inspect as "unable to be assessed" — do not leave blanks.
  6. Read the full form before signing, take your copies of the PDI Form and the CCP when you sign, and note the possession date on the CCP.
  7. Register for Tarion MyHome as soon as you move in, set reminders for day 41, day 183 and day 365, and enter your unresolved PDI items on the Initial Form right away.

Trust Professional, Diligent Work. I am Ming Ren. If you are taking possession of a new home, or buying or selling a resale home, bring the contract and the documents, and we will go through the paperwork and the timelines, item by item.


This article is general information only, not legal advice. Your contract terms, home type and warranty start date affect which forms and deadlines apply to you. Rely on the information shown on Tarion's website and in MyHome, and consult an Ontario lawyer where needed.

Primary sources: Tarion, "The Pre-Delivery Inspection," "Claim forms & timelines," and "Builder's guide to the Pre-Delivery Inspection" (tarion.com, consulted November 2026).

This article in other languages: 中文فارسی

Want to talk about your home?

You can also call directly, or scan the code to add Ming on WeChat.

Ming’s WeChat QR code
Scan to add on WeChat

Community guides by city

All cities →
☎ Call MingFree Evaluation