Ming RenBroker · RE/MAX Realtron Realty Inc., Brokerage
☎ 647-779-9186

Buying a Home

Your Addition, Rental Unit or Home Business Is Not the Seller's Problem: Ontario's Form 100, Clause 9

By , Broker, RE/MAX Realtron Realty Inc. (About Ming) · Published

Ming Ren · Broker · RE/MAX Realtron Realty Inc., Brokerage

← All articles · Buying a Home · Category guide

I am Ming Ren, a Broker with RE/MAX Realtron.

Here is the plain version first: the future you have planned for a house — an addition, a separate rental unit, a small business run from home — is not guaranteed by the seller unless it is written into the agreement of purchase and sale. That is not a trap set by anyone. It is the printed default in clause 9 of Ontario's standard OREA Form 100. The risk sits with the buyer by default, and the only way to move it is to check before you sign and write what you need into the contract.

This article covers that one clause: what it actually says, how it differs from the protection for present use, and which layers of rules really decide whether your plan can happen.

1. What clause 9 closes off

Clause 9 is titled FUTURE USE, and it is a single sentence. In substance, the two sides agree that there is no representation or warranty of any kind that the buyer's future intended use of the property is or will be lawful — with one exception: anything specifically provided for in the agreement itself.

Three points in that sentence are easy to skim past:

  • "Of any kind." The seller is not guaranteeing part of your plan and leaving the rest open. On this subject, there is no guarantee at all.
  • It is about the future, and about your plan. How the property is used today is not what this clause governs. What you intend to turn it into after closing is: an addition, a change of use, an added rental unit all fall inside it.
  • There is exactly one way out. The closing words — except as specifically provided in the agreement — mean a use discussed out loud does not count. A use written into the agreement or a schedule does.

Ontario courts have read the clause the way it is written. In Elliott v. Montemarano, 2020 ONSC 6852, the buyer pointed to pre-contract discussions about a future use; the court treated those discussions as superseded by the future use clause and the entire agreement clause in the signed APS, and held the buyer could not blame the seller for the buyer's own failure to investigate zoning. The lesson is the same one the form teaches: investigating is the buyer's homework.

2. Present use is protected. Future use is not.

Form 100 deals with "use" in two separate places, and they should not be confused:

Present use Future use
Where Clause 8, working with clause 10 Clause 9
The question Can the property's existing use, as written into the form, be lawfully continued? Can your planned new use be lawfully carried out?
What the form gives you A route to investigate during the title requisition period and object in writing; if the seller cannot or will not resolve a valid objection and you do not waive it, the agreement can come to an end and money paid is returned as the clause provides No investigation period, no objection right, no exit
Where protection comes from The printed form itself Only from wording you add to the agreement

In short, the form protects what the property is. It does not protect what you want it to become. Any part of the price you paid for that future — a premium priced on "we can add a rental unit" — has nothing underneath it unless the plan made it into the contract.

An illustrative example, with invented numbers only: a house is worth $900,000 as it stands, and you pay $60,000 more because you expect to carve out a basement unit. After closing, the municipality says that unit cannot be created. When you go back to the seller, clause 9 and the entire agreement clause are what you meet. The lost $60,000 expectation is, in principle, your account to settle, not the seller's.

3. Which rules actually decide your plan

Clause 9 says the seller gives no assurance. It does not say what the rules are. Whether a plan can proceed is decided by several independent layers, and failing any one of them is enough:

  • Zoning. Section 34 of the Planning Act authorizes municipal councils to pass zoning by-laws that govern what land and buildings may and may not be used for. If your use is not permitted in the property's zone, that is the first wall. A small departure can go to the committee of adjustment as a minor variance under section 45 of the Planning Act; a large one needs a zoning amendment, whose timing and outcome you do not control.
  • Building permits. Section 8 of the Building Code Act, 1992 requires a permit from the chief building official before a building is constructed or demolished. Section 10 adds that even with no construction, changing the use of a building requires a permit first if the change would increase hazard as measured under the building code. Zoning saying "this use is allowed" is not the same answer as "this particular basement meets fire, light and exit requirements." They are two different questions.
  • The provincial floor for added units. Sections 16(3) and 35.1 of the Planning Act limit what a by-law may prohibit: on a parcel of urban residential land served by municipal water and sewage, a by-law cannot prohibit the combinations totalling up to three residential units in a detached house, semi-detached house or rowhouse that the Act describes. That is a limit on blanket prohibition, not a building permit. Setbacks, height, parking and code requirements still have to be satisfied item by item.
  • Your own municipality's rules. Registration of additional units, short-term rental licensing and similar requirements differ from city to city. What works in one municipality cannot simply be carried over to the city where this house sits.

All of these questions have to be asked while you can still change the contract. Once the agreement is firm, a problem discovered later usually leaves nothing to do but absorb it.

Three misunderstandings I hear most often

"The seller and the listing agent both said an addition is fine, so I don't need it in writing." You do. The entire agreement clause in Form 100 (clause 26) provides, in substance, that the agreement together with its schedules is the whole agreement, and that no representation, warranty, collateral agreement or condition outside it affects it. "It should be fine," heard at a showing, is a starting point for your own checking — not a promise you can rely on.

"The zoning says residential, so a rental unit is obviously allowed." Not necessarily. A permitted use category is only the first layer; a building permit, the building code and municipal unit-registration rules are separate layers. The reverse can also mislead: the provincial floor for added units does not apply to a lot that is not urban residential land on municipal services.

"The seller warranted the zoning category, so my plan is covered." It is not the same statement. A warranty that land falls within a named zone speaks to how the land is currently classified. Whether your specific project is approved inside that zone, or needs a variance, is a different question. When you read the contract, separate statements about what exists today from statements about your particular plan.

Before you offer, do these six things in order

  1. Write your plan down as one specific sentence: what you will add, what use you will change it to, who you will rent it to, and roughly when. A plan that cannot be stated specifically cannot be checked, and cannot be put into a contract.
  2. Separate the plans that are your reason for buying this house from the ones that are only "maybe someday." Only the first group is worth the work of contractual protection, and any price premium paid for the second group deserves a question mark.
  3. Check the property's zone with the municipality where the house sits. Confirm your use is on the permitted list, and ask about the height, setback and lot-coverage rules that would apply to an addition.
  4. If the plan involves construction or a change of use, confirm the permit path with the municipal building department: whether a permit is needed, and where this particular building is likely to fall short of the code.
  5. Write down every statement the seller or an agent made about future use, and treat the list as questions still to be verified — not as promises already given.
  6. Take those results to your Ontario real estate lawyer and discuss whether the parts still uncertain should go into the offer as a condition tied to zoning confirmation, or to obtaining a minor variance or rezoning, with deadlines that fit alongside the offer's other conditions. The wording of that step is a lawyer's work; information from a brokerage is not legal advice.

Trust Professional, Diligent Work. I am Ming Ren. If you have questions about the clauses in a purchase agreement, write your plan down in one sentence, bring the documents, and we will go through the paperwork item by item.


This article is general information only, not legal advice. The zoning of your property, the rules of its municipality and the wording of your contract can all change the conclusion. Consult an Ontario lawyer before acting.

Primary sources: OREA Form 100 Agreement of Purchase and Sale, clauses 8, 9, 10 and 26 (clause 9 wording checked against OREA's annotated form); Planning Act, R.S.O. 1990, c. P.13, ss.16(3), 34, 35.1, 45; Building Code Act, 1992, S.O. 1992, c. 23, ss.8, 10 (Ontario e-Laws, consulted November 2026); Elliott v. Montemarano, 2020 ONSC 6852 (CanLII). The $900,000 and $60,000 figures are illustrative only, not a real transaction.

Frequently asked questions

The seller and listing agent said an addition is fine — do I still need it in writing?

Yes. Clause 26 of Form 100 provides that the agreement together with its schedules is the whole agreement, and no representation or warranty outside it affects it. “It should be fine” heard at a showing is a starting point for your own checking, not a promise you can rely on.

The zoning says residential, so is a rental unit obviously allowed?

Not necessarily. A permitted use category is only the first layer; a building permit, the building code and municipal unit-registration rules are separate layers. The provincial floor for added units also does not apply to a lot that is not urban residential land on municipal services.

The seller warranted the zoning category, so is my plan covered?

No — it is not the same statement. A warranty that land falls within a named zone speaks to how the land is currently classified, while whether your specific project is approved inside that zone, or needs a variance, is a different question.

This article in other languages: 中文فارسی

Want to talk about your home?

You can also call directly, or scan the code to add Ming on WeChat.

Ming’s WeChat QR code
Scan to add on WeChat

Community guides by city

All cities →
☎ Call MingFree Evaluation