I am Ming Ren, a Broker with RE/MAX Realtron.
Here is the plain conclusion first: most condo renovation problems do not start with bad workmanship. They start when an owner mixes two separate sets of rules into one. The first layer is your contract with the contractor, and Ontario's Consumer Protection Act, 2002 governs that layer. The second layer is your condominium corporation's rules — whether you may do the work, when you may do it, and how far it may go. A detailed contractor's contract never replaces corporation approval, and corporation approval never replaces a proper written contract. Get both layers right before anyone picks up a tool.
Layer one: the contract with your contractor
Ontario's rule is straightforward: a home renovation contract worth more than $50 must be in writing. That is a legal requirement, not a favour from the contractor. The province's consumer guidance adds a practical warning: if something is not written into your contract, you may not get it. Brand names, dates and clean-up promises made in conversation all belong on paper.
Check the contract against this list before you sign:
| What must be clear | What to look for |
|---|---|
| The contractor | The legal name, address and contact information of the business or person — you will need it if anything goes wrong |
| The work and materials | Exactly what will be done and what materials will be used, in detail, not just "kitchen renovation" |
| Estimate and total price | The written estimate included in the contract, plus the total cost and payment terms |
| Timing | A start date and a completion date, not just "a few weeks" |
| Payment schedule | When each payment is due, including the deposit, and what stage of work each payment matches |
| Warranties | A clear description of any warranties or guarantees |
| Clean-up and sub-trades | Who cleans up at the end, which work is subcontracted out, and who pays those sub-trades |
Two different "10%" figures appear here, and they are often confused. The first is a legal cap on the estimate: if the estimate forms part of your contract, the final price cannot exceed the estimate by more than 10% unless you agreed to new work or a new price and signed a change to the contract. An invented example, for illustration only: on a $30,000 estimate, without a change you signed, the bill cannot simply run past roughly $33,000. The second 10% concerns the deposit: the Government of Ontario recommends keeping a down payment to no more than 10% of the contract price. That is a recommendation, not a legal cap — and the same guidance says never to pay the full amount before the work is done.
One deadline depends on where you sign. If a contract worth $50 or more is signed in your home, you have a 10-calendar-day cooling-off period and may cancel for any reason. The period runs from when you receive your written copy of the agreement, and cancelling in writing leaves you a record. Note the trade-off: if you let work start during the cooling-off period and then cancel, you may owe reasonable compensation for work done and materials supplied. There is rarely a good reason to rush the start inside those 10 days.
Layer two: the corporation's rules govern only your building
This layer does not come from consumer law. It comes from the Condominium Act, 1998 and your own building's documents. Under section 58, the board may make rules about the use of units and the common elements; the rules must be reasonable and consistent with the Act, the declaration and the by-laws. Under section 119, owners must comply with those documents. In practice, most buildings regulate renovations through their rules: permitted work hours, booking and protecting the service elevator, where construction waste may go, any renovation deposit, and what contractor insurance and WSIB documents management wants to see. The amounts and procedures differ from building to building, so I will not invent your building's numbers here — ask management for the current renovation rules and application form before you sign, and work through them item by item.
The point owners most often get wrong in this layer is section 98. A section 98 agreement is not required for every renovation. It arises only when the work touches the common elements: to make an addition, alteration or improvement to the common elements, the board must first approve it by resolution, and you and the corporation must enter into a section 98 agreement allocating the cost and setting out each side's duties for repair after damage, maintenance and insurance. Work that stays inside your unit and does not touch the common elements is outside section 98 — but it is still measured against the declaration and the rules. A wall standing inside your suite is not automatically all "your unit" in law; the boundary is drawn by your building's description and declaration. If you are unsure, ask management before anything is opened up, not after.
Keep one more line separate: corporation approval answers "will the building allow it," while a municipal building permit and electrical inspection answer "is it built to code." Those are a different track. The contract should state who applies for permits and who pays, and work that needs a permit should not start before you have seen it.
Layer three: pin down the start conditions and the payments
Both layers should land on two points in the contract. The first is the start condition: make corporation approval in writing, and any required permits, a condition of starting, and agree in advance what happens to money already paid if the corporation refuses the work or restricts it heavily. The second is changes and payments: surprises are normal mid-renovation, but any extra work, material swap or price change follows the rule above — it counts only once you have agreed and signed the change. Tie each progress payment to a completed stage, and leave the final payment until the work is finished and any required inspections have passed. Verify the contractor's insurance, WSIB status and any subcontractors before signing and attach them to the contract; if there is a dispute, you will rely on the contract and its attachments, not on chat messages.
Common misunderstandings
"The 10% deposit is a legal cap, so charging more is illegal." No. The 10% deposit figure is a Government of Ontario recommendation, not a statutory limit. The binding 10% rule is the other one: once an estimate is part of the contract, the final price may not exceed it by more than 10%, except for changes you agreed to and signed. One 10% is advice; the other is law.
"Once the contractor has signed, the corporation's approval can be sorted out later." That reverses the order. Corporation approval is a condition of starting, not closing paperwork. Starting without it breaches the building's documents, and the corporation can require the work to stop or be put back — with the cost landing on the owner.
"A section 98 agreement means I can change anything." Section 98 deals only with the part of the work that touches the common elements. It does not waive municipal permits, it does not change your consumer rights under the contract with your contractor, and it is not the approval route for work inside the unit.
Before you sign, do these five things in order
- Get the current renovation rules and application form from management, and confirm whether your project needs corporation approval, whether it touches the common elements, and whether a section 98 agreement is required.
- Compare at least three written estimates, then require the chosen estimate to be included in the contract, and check the contract against the table above before signing.
- Keep the deposit as small as you can, tie payments to completed stages, and require every extra or price change to be a written change signed by you.
- Verify the contractor's insurance, WSIB status and subcontracting arrangements, and attach them to the contract; for work needing permits, state who applies and who pays.
- If you sign at home, note the date you received the written contract — the 10-day cooling-off period runs from that date — and if you cancel, do it in writing and keep proof of delivery.
Trust Professional, Diligent Work. I am Ming Ren. Before you sign a renovation contract, bring both sets of documents and we will go through the contract terms and the building rules, item by item.
This article is general information, not legal advice. Your building's declaration, by-laws and rules, and the scope of your particular project, can change the conclusion. Consult an Ontario lawyer before signing.
Primary sources: Consumer Protection Act, 2002 (Ontario e-Laws); Consumer Protection Ontario / Government of Ontario, "Your rights when starting home renovations or repairs" (ontario.ca, consulted November 2026); Condominium Act, 1998, ss.58, 98, 119 (Ontario e-Laws). The $30,000 and $33,000 figures are illustrative examples, not real quotations.