I am Ming Ren, a Broker with RE/MAX Realtron.
The conclusion first: if you add residential units to a detached house, a semi-detached house or a rowhouse, and the arrangement fits one of the fact patterns written into the statute, the municipal development charge really is waived — the exemption is imposed by provincial law, and a municipality cannot use its own bylaw to charge it back. But the word "free" has three hard edges: it stops at the third unit, units in ancillary buildings (a suite over a garage, a garden suite) come with unit-count conditions, and the exemption removes only the development charge — the other costs of building are all still there. Let me draw the edges one at a time.
A word of background: a development charge is a one-time municipal levy on new construction and additions, meant to recover the capital cost of the water, sewer, roads and other infrastructure that growth requires. In many Ontario municipalities the charge on a single unit runs into the tens of thousands of dollars, so whether it is waived often decides whether an addition project makes financial sense at all.
Edge one: the exemption covers three fact patterns, all in section 2 of the Development Charges Act
Bill 23 — the More Homes Built Faster Act, 2022, which received Royal Assent on November 28, 2022 — moved the additional-unit exemption into the body of the Development Charges Act, 1997 itself: subsection 2(3.2) for existing houses and subsection 2(3.3) for new houses, on essentially the same terms. Only three kinds of creation are exempt:
| Pattern | Where the unit goes | The condition attached |
|---|---|---|
| A second residential unit | Inside the detached, semi-detached or rowhouse itself | All buildings and structures ancillary to the house contain no more than one residential unit in total |
| A third residential unit | Inside the house itself | No ancillary building or structure contains any residential unit |
| One unit in an ancillary building | Above a garage, in a garden suite, and similar | The house itself contains no more than two residential units, and no other ancillary building or structure contains a unit |
The way to read this table is to count every unit on the parcel and note where each one sits. An example I made up, only to show how the rule works: your detached house has one unit today. You add a basement unit (the second), and you also want a suite over the garage. Count the ancillary buildings: the garage suite is one unit in an ancillary structure, which lands on the third row of the table — it requires the house itself to hold no more than two units, and you have exactly two, so it can be exempt. But if the house itself already held two added units (a second and a third), and you then placed another in the garage, the third-unit row requires the ancillary buildings to hold none — the combination no longer fits, and the excess falls back to normal charging under the municipal bylaw.
This lines up with section 35.1 of the Planning Act, under which up to three units on a qualifying urban residential parcel are permitted as of right, without a site-specific rezoning. Planning law lets you build three; the charges law waives the development charge on the same envelope, arranged as the statute describes. The two rules are one policy pointing in one direction.
Edge two: what is waived is the development charge — not the cost of building
This is where the one-word summary "free" misleads people. The exemption removes only the charge imposed under the Development Charges Act. The following remain payable and must stay in your budget:
- Building permit fees — charged under each municipality's own fee schedule, under separate authority.
- Water, sewer connection and capacity-type charges — municipalities may levy these under other statutes; the names differ by city, so ask for them item by item.
- Education development charges — levied by school boards under the Education Act, outside the reach of the Development Charges Act exemption. Which board's charge area your project falls in, and whether it is triggered, has to be checked separately.
Separately, the same Bill 23 package amended the Planning Act to relieve these added units in relation to parkland dedication and community benefits charges as well. Those are parallel lines of relief, not the same account as the development charge — keep them in separate rows of your budget.
Edge three: from the fourth unit on, the provincial exemption no longer runs the show
The statutory patterns stop counting at three units. A fourth unit or more — converting a house into a fourplex or a small multi-unit building — is charged, or not, according to your own municipality's development charges bylaw: some cities have their own relief for small-scale multi-unit projects, others charge the full schedule. There is no province-wide answer for that segment; you have to read the current bylaw and rate schedule of your municipality, as of the date you apply, because both are amended over time.
One timing question comes up constantly: development charges paid on an addition built before Bill 23 — can they be claimed back now? The exemption is a charging rule that governs charges levied after it took effect. Charges properly levied and paid under the rules in force at the time are not automatically refunded because the law later changed. Where your own case sits on the timeline, and under which bylaw you were charged, has to be checked against your actual payment records — do not budget on the assumption of a refund.
Three common misunderstandings
Misunderstanding 1: "After Bill 23, adding a unit costs nothing in government fees." No. Only the development charge is waived. Permit fees, connection-type charges and education development charges each rest on their own authority and remain on the bill.
Misunderstanding 2: "Any arrangement of three units is exempt." Not necessarily. Whether a unit sits in the house or in an ancillary building decides which row of the table applies and which condition comes with it. Two in the house plus one in the garage can fit; stacking them the other way can fall outside. Draw the layout and count against the statute before you build.
Misunderstanding 3: "The city says it charges, so the city must be right." The development charge exemption is written directly into provincial law. If your project fits an exempt pattern, a municipal bylaw cannot override it. If you are charged anyway, ask for the specific provision relied on, and compare it against subsections 2(3.2) and 2(3.3) before you pay.
Before you start work, I suggest this order
- Draw the unit layout first: how many units in the house, how many in ancillary buildings. Fix the total and the placement before you talk design.
- Test each unit against subsection 2(3.2) or 2(3.3) of the Development Charges Act — which exempt pattern it falls in, and whether the attached condition is met.
- Ask the municipality for a written, itemized fee list — development charges, permit fees, connection charges, education development charges on separate lines. Only the first line is waived; the rest belong in the project budget.
- If you are planning more than three units, read your municipality's current development charges bylaw for how the fourth unit onward is treated. Do not extrapolate from "the first three were free."
- Keep the full set of permits and payment records. When you eventually sell, the paper trail for legal units is part of the value.
Work honestly, and work diligently. I am Ming Ren. On an addition project, draw the charging boundaries first and talk about rental returns second — reverse that order and the arithmetic goes wrong.
This article is general information, not legal advice. Municipal bylaws, fee schedules and education development charge areas affect the result; verify with your municipality and school board, and consult an Ontario lawyer, before you build.
Primary sources: Development Charges Act, 1997, S.O. 1997, c.27, s.2(3.2), (3.3) (Ontario e-Laws, as amended by the More Homes Built Faster Act, 2022); Planning Act, R.S.O. 1990, s.35.1 (consulted November 2026). The house example is illustrative, not a real case.
Frequently asked questions
After Bill 23, does adding a unit cost nothing in government fees?
No. Only the development charge is waived. Permit fees, connection-type charges and education development charges each rest on their own authority and remain on the bill.
Is any arrangement of three units exempt from development charges?
Not necessarily. Whether a unit sits in the house or in an ancillary building decides which statutory pattern applies and which condition comes with it, so draw the layout and count against the statute before you build.
The city says it charges, so the city must be right?
No. The exemption is written directly into provincial law, and a municipal bylaw cannot override it for a project that fits an exempt pattern. If charged, ask for the specific provision relied on and compare it against subsections 2(3.2) and 2(3.3) before paying.


